My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 6-07.3(8)A Paint Film Thickness Measurement Gages <br /> 2 The first paragraph is revised to read: <br /> 3 <br /> 4 Paint dry film thickness measurements shall be performed with either a Type 1 pull-off <br /> 5 gage or a Type 2 electronic gage as specified in SSPC Paint Application Specification No. <br /> 6 2, Procedure for Determining Conformance to Dry Coating Thickness Requirements. <br /> 7 <br /> 8 6-07.3(9) Painting New Steel Structures , <br /> 9 The last sentence of the second paragraph is revised to read: <br /> 10 <br /> 11 Welded shear connectors are not required to painted. <br /> 12 <br /> 13 The last paragraph is revised to read: <br /> 14 <br /> 15 Temporary attachments or supports for scaffolding, containment or forms shall not <br /> 16 damage the paint system. <br /> 17 <br /> 18 6-07.3(9)A Paint System , <br /> 19 The first paragraph is revised to read: <br /> 20 <br /> 21 The paint system applied to new steel surfaces shall consist of the following: 11122 <br /> 23 Option 1 (component based paint system): <br /> 24 <br /> 25 Primer Coat— Inorganic Zinc Rich 9-08.1(2)C <br /> 26 Intermediate Coat— Moisture Cured Polyurethane 9-08.1(2)G <br /> 27 Intermediate Stripe Coat— Moisture Cured Polyurethane 9-08.1(2)G <br /> 28 Top Coat— Moisture Cured Polyurethane 9-08.1(2)H <br /> 29 <br /> 30 Option 2 (performance based paint system): <br /> 31 <br /> 32 Primer Coat— Inorganic Zinc Rich 9-08.1(2)M <br /> 33 Intermediate Coat— Epoxy 9-08.1(2)M <br /> 34 Intermediate Stripe Coat— Epoxy 9-08.1(2)M <br /> 35 Top Coat— Polyurethane 9-08.1(2)M <br /> 36 <br /> 37 The following new paragraph is inserted after the first paragraph: <br /> 38 <br /> 39 Paints and related materials shall be products listed in the current WSDOT Qualified <br /> 40 Products List (QPL). Component based paint systems shall be listed on the QPL in the <br /> 41 applicable sections of Section 9-08. Performance based systems shall be listed on the <br /> 42 current Northeast Protective Coatings Committee (NEPCOAT) Qualified Products List `A" <br /> 43 as listed on the WSDOT QPL in Section 9-08.1(2)M. If the paint and related materials for <br /> 44 the component based system is not listed in the current WSDOT QPL, a sample shall be <br /> 45 submitted to the State Materials Laboratory in Tumwater for evaluation and acceptance in <br /> 46 accordance with Section 9-08. <br /> 47 — <br /> 48 6-07.3(9)C Mixing and Thinning Paint <br /> 49 This section is revised to read: <br /> 50 <br /> 51 The Contractor shall thoroughly mix paint in accordance with the manufacturer's written <br /> 52 recommendations and by mechanical means to ensure a uniform and lump free <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.