My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 Paint systems for Piling, Landing Aids, Life Ladders, underside of vehicle transfer <br /> 3 span bridge decks, non-skid surface treated areas, and anti-graffiti coatings shall be <br /> 4 as specified in the Special Provisions. <br /> 5 <br /> 6 6-07.3(12)B4 Paint Color <br /> 7 Paint colors shall be as specified in the Special Provisions. <br /> 8 <br /> 9 6-07.3(12)B5 Coating Thickness <br /> 10 Coating thicknesses shall be as specified in the Special Provisions. <br /> 11 <br /> 12 6-07.3(12)B6 Application of Field Coatings <br /> 13 Application of field coatings shall be in accordance with Section 6-07.3(10)0 and <br /> 14 Section 6-07.3(12)A2 except for the following: <br /> 15 <br /> 16 1. All coatings applied in the field shall be applied using a brush or roller. Spray <br /> 17 application methods may be used if allowed by the Engineer. <br /> 18 <br /> 19 2. Applied coatings shall not be immersed until the coating has been cured as <br /> 20 required by the coating manufacturer. <br /> 21 <br /> 22 3. Non-skid surface treatment products shall be applied in accordance with the <br /> 23 manufacturer's recommendations. <br /> 24 <br /> 25 4. Anti-graffiti coatings shall be applied in one coat following application of the <br /> 26 top coat, where specified in the Plans. <br /> 27 <br /> 28 6-07.3(14)B Reference Standards <br /> 29 The second standard reference (to SSPC CS 23.00), and its accompanying title, is revised to <br /> 30 read: <br /> 31 <br /> 32 SSPC CS 23.00 Specification for the Application of Thermal Spray Coatings <br /> 33 (Metallizing) of Aluminum, Zinc, and Their Alloys and <br /> 34 Composites for the Corrosion Protection of Steel <br /> 35 <br /> 36 6-08.AP6 <br /> 37 Section 6-08, Bituminous Surfacing on Structure Decks <br /> 38 January 7, 2019 <br /> 39 6-08.3(7)A Concrete Deck Preparation <br /> 40 The first sentence of the first paragraph is revised to read: <br /> 41 <br /> 42 The Contractor, with the Engineer, shall inspect the exposed concrete deck to establish <br /> 43 the extent of bridge deck repair in accordance with Section 6-09.3(6). <br /> 44 <br /> 45 6-08.3(8)A Structure Deck Preparation <br /> 46 The second sentence of the last paragraph is revised to read: <br /> 47 <br /> 48 Prior to applying the primer or sheet membrane, all dust and loose material shall be <br /> 49 removed from the Structure Deck. <br /> 50 ' <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#1-ILP PB17(014);COE#PW3688 Page AM-58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.