PLUMBING GENERAL NOTES
<br /> 1. COMPLETE INSTALLATION OF THE MECHANICAL SYSTEM SHALL BE PER THE STATE OF WASHINGTON
<br /> /1
<br /> BUILDING, MECHANICAL ENERGY, FIRE, PLUMBING AND HEALTH CODES AND REGULATIONS I ABaSSEIN
<br /> AS ADOPTED BY LOCAL JURISDICTIONS.
<br /> 2. ALL EQUIPMENT/FIXTURES SHALL BE THE CAPACITY AND TYPES AS SHOWN ON THE PLUMBING SCHEDULE AND ENGINEERING
<br /> BE THE LISTED MANUFACTURER AND MODEL NUMBER OR SHALL BE AN EQUAL APPROVED BY THE i INEERING
<br /> OWNER/ENGINEER. " IJ.L.1.
<br /> EXISTING 4 LOW PRESSURE GAS
<br /> II
<br /> 3. THE CONTRACTOR SHALL SUBMIT MINIMUM OF SIX COPIES OF EQUIPMENT/FIXTURE SUBMITTALS FOR APPROVAL. f TO PARTY CITY ROO ESS
<br /> HVAC UNITS
<br /> 4. CONTRACTOR IS TO BRING UP ANY DISCREPANCIES AND ITEMS WHICH ARE NOT SPECIFICALLY CALLED
<br /> FOR OR SHOWN BUT ARE REQUIRED FORA COMPLETE MECHANICAL SYSTEM AND AFFECT HIS CONTRACT EXISTING GAS PIPING TO I;
<br /> MECHANICAL-ELECTRICAL
<br /> PRIOR TO ENTERING AND SIGNING THE CONTRACT; AFTER AWARDING THE CONTRACT ALL SUCH ITEMS BE REUSED --- --- CIVIL,-LEID_STRUCTURAL
<br /> REQUIRED FORA COMPLETE SYSTEM READY FOR THE OWNER'S USE SHALL BE FURNISHED ---"\ FIRE PROTECTION
<br /> AND INSTALLED INCLUDING ALL SUCH DISCREPANCY ITEMS MENTIONED ABOVE, AT NO ADDITIONAL COST
<br /> TO THE OWNER AND PER LOCAL CODES. MANUFACTURER'S RECOMMENDATIONS AND APPLICABLE j \ 2100 112TH AVE. NE
<br /> BELLEVUE, WA 98004
<br /> STANDARDS WITH THE ARCHITECT/ENGINEER'S APPROVAL. Lr.\`� \J f \ \
<br /> g i iii%ifiiiiiir�sayi iii oo�oiai_l�lO/O//aoiaiiaiols"-moi r•�G//io.,ro� i --- -�{ ;1 \
<br /> 5. ALL EQUIPMENT/FIXTURES SUPPLIED FOR THESE SPECIFICATIONS SHALL BE FREE FROM DEFECTS IN MATERIAL, _ OFFICE: (425)462-9441
<br /> AND TITLE ' -_- I RTU / FAX (425)462-9451
<br /> WORKMANSHIP, ,AND SHALL BE OF THE KIND AND QUALITY DESCRIBED HEREIN. IF IT G
<br /> APPEARS WITHIN ONE YEAR FROM DATE OF FINAL ACCEPTANCE THAT EQUIPMENT DOES NOT MEET THE I` �� )\2 I �7
<br /> R - I6
<br /> WARRANTIES ABOVE,THE CONTRACTOR SHALL IMMEDIATELY CORRECT ANY DEFECT AND SHALL RESTORE _z L---- I �,_ ,____ 0 ENTAIL:
<br /> �' y I % \ CService®abossein.com
<br /> THE SYSTEM TO THE ORIGINAL CONDITIONS AT HIS EXPENSE. THE FOREGOING WARRANTY I` j"%i �,��
<br /> IS EXCLUSIVE AND IN LIEU OF OTHER WARRANTIES, WHETHER WRITTEN, ORAL, IMPLIED OR STATUTORY.
<br /> NO WARRANTY OF MERCHANT ABILITY OF FITNESS FOR PURPOSE SHALL APPLY. (THE WARRANTY SHALL ; O ! WEBSITE:
<br /> /
<br /> START FROM THE TIME OF ARCHITECT/ENGINEER'S FINAL ACCEPTANCE.) 1
<br /> .5"/ R3U www.abossein.com
<br /> 1
<br /> 6. ENTIRE INSTALLATION OF ALL EQUIPMENT, FIXTURES, PIPING, PLUMBING AND RELATED ACCESSORIES
<br /> SHALL BE PER OWNERS' STANDARDS. MECHANICAL CONTRACTOR IS TO FAMILIARIZE HIMSELF i
<br /> 1-..:i-- 11
<br /> �\
<br /> WITH THESE STANDARDS. I � \
<br /> 1-1/4"GAS LINE DROP DN I --__ I�
<br /> 7. COORDINATE WITH THE STRUCTURAL ENGINEER TO PROVIDE STRUCTURAL SUPPORT FOR ALL EQUIPMENT. 0
<br /> INTO SPACE WITH SHUT OFF � \ � :_ �"
<br /> 8. COORDINATE THE CONSTRUCTION SCHEDULE WITH THE OWNER AND PERFORM ALL REQUIRED WORK IN VALVE FOR TENANT 199 MBH ' -411k,7-7-\\ 1---,'
<br /> ,���.�GAS WATER HEATER. AY' 6)
<br /> ` off,
<br /> STRICT ACCORDANCE WITH THE OWNER'S SCHEDULE. ° /-NEW GAS PIPING .. - - -
<br /> 9. PLUMBING CONTRACTOR SHALL PAY FOR AND OBTAIN ALL REQUIRED PERMITS AND CERTIFICATES REQUIRED
<br /> I '%� �� 4W,1411C:
<br /> BY THE AUTHORITIES HAVING JURISDICTION !
<br /> I
<br /> EXISTING GAS PIPING TO
<br /> 10.ADJUST ALL EQUIPMENT AND PERFORM A COMPLETE WATER-BALANCING AND PUT ALL PLUMBING SYSTEMS IN BE REUSED I 21891 /�
<br /> OPERATION. - .-.... �.. �'
<br /> f
<br /> 11.AIR-CONDITIONING UNIT COIL WITHOUT INTERNAL TRAP SHALL HAVE A P-TRAP (3" MIN. SEAL) FOR THE --- '•75 :N,
<br /> CONDENSATE PAN. DISCHARGE CONDENSATE DRAIN TO ROOF DRAIN. 0 1 \
<br /> 413)
<br /> \ li
<br /> 12. PLUMBING CONTRACTOR SHALL VISIT THE SITE TO DETERMINE THE EXACT IMPACT OF THE NEW CONSTRUCTION 6"CAPPED ROOF JACK FOR I - -
<br /> FOR THE PLUMBING SYSTEM AND SHALL INCLUDE IN HIS BID ALL THE WORK WHICH MIGHT NOT BE SPECIFICALLY i I TENANT 6"0 TYPE B VENT FOR
<br /> MENTIONED BUT ARE REQUIRED FOR A COMPLETE PLUMBING SYSTEM READY FOR OWNER'S BENEFICIAL USE. I \ .__________ __________
<br /> i ;! WATER HEATER
<br /> � j °
<br /> 0.
<br /> , I
<br /> 13. SCOPE OF WORK: ; -
<br /> li
<br /> THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL THE COST RELATED TO INSTALLING NEW PIPING AND I I I _sg �, ._-_--.-._-_-_--__- -___--_`,�- .-__-_--__----____--..___.. __.___---- 9. .�
<br /> r
<br /> NEW FIXTURES AS SHOWN AND AS REQUIRED BY THE UNIFORM PLUMBING CODE AND THE LOCAL I NOTE: �' I I / ° ® Z
<br /> �
<br /> JURISDICTIONS. ALL PLUMBING SYSTEM (PIPING, FIXTURES, EQUIPMENT, ETC.) INSIDE THE BUILDING SHALL --- ALL EXHAUST AND PLUMBING VENTS SMOKE DUCT \
<br /> Mir SHALL BE A MINIMUM OF 10 FT FROM !I DETECTOR °yy./
<br /> Pt
<br /> BE NEW AND CONNECT TO NEW SANITARY AND NEW WATER PIPES OUTSIDE THE BUILDING. ii_
<br /> \ c n �1
<br /> -, OUTSIDE AIR INTAKES (TYPICAL) C til I a.,i
<br /> THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL THE COST RELATED TO INVESTIGATING THE ROUTING c..D \ CD
<br /> OF SITE UTILITY PIPES IN ORDER TO MAKE NEW CONNECTIONS FOR THE NEW FIXTURES. (THE PIPE RTU I ''N'N'\":%""
<br /> : igar \ , _--______---
<br /> ROUTING AND CONNECTIONS MAY NOT BE SPECIFICALLY SHOWN ON THE DRAWINGS) ° In \
<br /> 1-4
<br /> -
<br /> THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL THE COSTS REQUIRED FOR ALL THE PIPING TO G G G 0 144
<br /> m ID
<br /> 44
<br /> MEET THE PIPE SIZES PER THE UNIFORM PLUMBING CODES APPENDIX A - NEW GAS PIPING �1
<br /> 14. SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL SCOPE OF WORK, INSTRUCTION TO --- --- -\ _ _ \-I ® \
<br /> A
<br /> BIDDERS AND EXACT LOCATION OF ALL FIXTURES. J �� s--\_:\ °
<br /> rg
<br /> 15. COORDINATE EXACT LOCATION OF ALL EQUIPMENT, FIXTURES, PIPING, ETC. AND PENETRATIONS WITH -- ---- / R iU -- \__ \
<br /> \ r-i
<br /> THE _____1,/EW GAS PI G-� \ �,r, ; 411) COO 14., 1
<br /> =,
<br /> ARCHITECTURAL STRUCTURAL AND AT SITE.
<br /> 16.ALL APPLICABLE CODES AND LOCAL JURISDICTION REGULATIONS SHALL SUPERSEDE THE CONSTRUCTION 1 !I j ) \
<br /> DOCUMENTS IF THEY ARE MORE STRINGENT. /
<br /> rT� \
<br /> 17. INSTALL ALL TRAP ARMS SUCH THAT THE MAXIMUM LENGTH WILL NOT EXCEED THE CODE REQUIREMENTS. ! j \ `
<br /> 1
<br /> .,,N\
<br /> 18.ALL FIXTURES REQUIRING PLUMBING SHALL BE CONNECTED TO BUILDING WASTE, VENT, COLD WATER AND HOT I 1 I I (Tr I /J C Er i \\
<br /> WATER SYSTEM AS REQUIRED BY THE CODES. - �-� / \ ,� Z
<br /> 19. INSTALL CLEANOUTS PER THE 2009 UPC-SECTION 707 AND AS REQUIRED BY LOCAL JURISDICTIONS. ;I i I '\ \ PP\\ <4
<br /> 20. PIPE MATERIAL: I /`
<br /> of
<br /> COLD WATER & HOT WATER COPPER "L" (ABOVE GROUND)(LEAD FREE) " ( ® I-
<br /> \
<br /> /2.5"/-\ • 'N"7' ,,ULTA AUTY SUPPLY-GAS SUB-METER. \ Ey Z 1
<br /> THROUGH ROOF_TO GOOSENECK NEW GAS PIPING /1.0" LANDL EXIT CORRIDOR-GAS SUB-METER.
<br /> JOINTS - TfRMfi�AitOtV�TfRMfNAT€-DtlOT1A� RK -I J \ FUTU FpOD COURT TENANT GAS SUB-METER.
<br /> NOTE. AND METHOD OF CONNECTIONS SHALL BE PER THE 2009 UPC CHAPTER #14, ASTM STANDARDS 24" BELOW ROOF STRUCTURE R I G _ PAR �1 -GAS SUB METER.
<br /> AND MANUFACTURERS RECOMMENDATIONS FOR EACH PIPE TYPE AND APPLICATIONS. TENANT'S FINAL CONNECTION !1 I A -G _ -------_____________G_______________________ _-----_. ___---__.- ____G______ --------\„ �EXISTI I6 .\' LORD'S
<br /> J
<br /> fPLI
<br /> - - _ GAS M d
<br /> L o ���5700A'/ 1 r%'ill lG �l�l !//l�/��' O 4�////Y.%GU/.'l�� U o�V.�:L H Y/1/�'' -%i� ���/ %lL: '/!✓iV ���
<br /> 41)
<br /> 21. PIPE INSULATION: r �� ��i lam _- - -_ -__ --_==-- ° - `1 ERS D s TENANT
<br /> " I 1-- " NEW GAS PIPING -�-, 25� - --
<br /> COLD WATER 1/2 INSULATION WITH VAPOR BARRIER JACKETS. (-RD
<br /> -.,-,'-
<br /> I
<br /> 25� \ I
<br /> it i W g
<br /> HOT WATER - 1" INSULATION WITH VAPOR BARRIER JACKETS. FOR RUNOUTS UP TO 12 H
<br /> FEET AND 1" INSULATION FOR ALL PIPING UP TO 2" DIAMETER. ��/00: Z II ---
<br /> I I
<br /> UNDERGROUND PIPING WITH 1/2" CLOSED CELL FOAM INSULATION. I 1 I I
<br /> I g
<br /> 22. PIPE HANGERS AND SUPPORTS: Lh I I
<br /> i. I I!
<br /> PIPE HANGERS AND SUPPORTS SHALL BE IN STRICT ACCORDANCE WITH THE 2009 UPC-SECTION-314 AND PIPE ! I I j I I ri)
<br /> MANUFACTURERS RECOMMENDATIONS. ALL PIPES SHALL BE SEISMICALLY RESTRAINED PER LATEST EDITION �._-j I I I I I I \� o
<br /> OF S.M.A.C.N.A. SEISMIC RESTRAINT MANUAL AND AS REQUIRED BY LOCAL JURISDICTION. - - LCD
<br /> -
<br /> riff �.,,r. .r� of,,,, 7:97.W.i rr� 0 I
<br /> 23.THE CONTRACTOR SHALL INCLUDE ALL EXCAVATION AND BACKFILLING REQUIRED FOR UNDERGROUND = I I
<br /> WORK IN HIS BID UNLESS OTHER ARRANGEMENTS ARE MADE WITH THE GENERAL CONTRACTOR PRIOR , a
<br /> TO BIDDING. (COORDINATE WITH SITE CIVIL ENGINEER). _Ivi i
<br /> 24. DOMESTIC HOT WATER SYSTEM SHALL BE SET FOR 120'F OR AS REQUIRED BY LOCAL JRSD. --__ a Li
<br /> I psI L � I'� __.__�_._______:_______
<br /> 25.ALL WATER LINES SHALL BE STERILIZED IN ACCORDANCE WITH THE A.W.W.A. STANDARDS AND LOCAL REGULATIONS. I \ __ _ ��
<br /> 26. ALL MATERIALS USED SHALL BE NEW AND BEAR U.L. LABEL WHEN REQUIRED. I 7\
<br /> =\ % \
<br /> 27. FINAL AS BUILT DRAWINGS SHALL BE SUBMITTED TO ENGINEER/OWNER. jam: ii�\ \ /
<br /> \) --
<br /> 28.
<br /> ALL OPENINGS AND PENETRATIONS THROUGH ROOF AND/OR WALLS SHALL BE PROPERLY SEALED, \ice j,' Z
<br /> WEATHERTIGHT, AND AESTHETICALLY ACCEPTABLE. /% �;\/
<br /> 29.ALL CUTTING AND PATCHING REQUIRED FOR INSTALLATION OF NEW EQUIPMENT, FIXTURES AND PIPING \� ��
<br /> TO BE BY CONTRACTOR. \ \/ / 0-4
<br /> 30. INSTALL AIR CHAMBERS BEHIND EACH OUTLET OR WADE-SHOKSTOPS FOR EACH FIXTURE GROUP AND WATER --_
<br /> HAMMER ARRESTORS AS SCHEDULED. i\� I
<br /> ,----- \
<br /> 7 s I N i �i C
<br /> „.--e",,\--------4,\ 7. I
<br /> ,
<br /> ji 1 \ I I<,,
<br /> LENGEND AND ABBREVIATIONS \\ \ I k\\
<br /> trI Z
<br /> SYMBOL ABBR DESCRIPTION SYMBOL ABBR DESCRIPTION a
<br /> 1"I COLD WATER PIPE --- CW COLD WATER PIPE
<br /> 1" HW HOT WATER PIPE HOT WATER PIPE - - V VENT
<br /> 0
<br /> 4" WASTE/SANITARYU PIPE SIZE W/SS WASTE OR SANITARY SEWER PIPE O
<br /> 2" VENT PIPE SIZE ' GV GATE VALVE ROOF OF PLAN -- HVAC a
<br /> CW BALL VALVE
<br /> SCALE: 1/8"= 1'-0"
<br /> P1 PLUMBING FIXTURE TAG _ A
<br /> �- VTR VENT THRU ROOF ___
<br /> Q PLAN NOTE #1 ,J BURIED PIPE NORTH M
<br /> H FCO FLOOR CLEANOUT -R- CHECK VALVE
<br /> 0.5" 1/2"PIPE SIZE CONN CONNECT
<br /> 0.75" 3/4"RPE SIZE Revisions: Date:
<br /> 1" 1"PIPE SIZE TEMP TEMPREATURE
<br /> 1.25" 1-1/4"PIPE SIZE PERMIT SET 8/3/12
<br /> 1.5" 1-1/2"PIPE SIZE PRESS PRESSURE
<br /> 2" 2"PIPE SIZE EXIST EXISTING
<br /> 2.5" 2-1/2"PIPE SIZE TYP TYPICAL
<br /> 3" 3"PIPE SIZE
<br /> DN DOWN
<br /> o- PIPE ELBOW UP GPH GALLONS PER HOUR
<br /> o- PIPE ELBOW DOWN
<br /> -o- PIPE TEE UP GPM GALLONS PER MINUTE
<br /> -e- PIPE TEE DOWN
<br /> Job No.:212080
<br /> Date:
<br /> P2.0 1
<br /> I OF 3)
<br /> 1402 SE Everett Mall Way, B1208-010
<br />
|