Laserfiche WebLink
PLUMBING GENERAL NOTES <br /> 1. COMPLETE INSTALLATION OF THE MECHANICAL SYSTEM SHALL BE PER THE STATE OF WASHINGTON <br /> /1 <br /> BUILDING, MECHANICAL ENERGY, FIRE, PLUMBING AND HEALTH CODES AND REGULATIONS I ABaSSEIN <br /> AS ADOPTED BY LOCAL JURISDICTIONS. <br /> 2. ALL EQUIPMENT/FIXTURES SHALL BE THE CAPACITY AND TYPES AS SHOWN ON THE PLUMBING SCHEDULE AND ENGINEERING <br /> BE THE LISTED MANUFACTURER AND MODEL NUMBER OR SHALL BE AN EQUAL APPROVED BY THE i INEERING <br /> OWNER/ENGINEER. " IJ.L.1. <br /> EXISTING 4 LOW PRESSURE GAS <br /> II <br /> 3. THE CONTRACTOR SHALL SUBMIT MINIMUM OF SIX COPIES OF EQUIPMENT/FIXTURE SUBMITTALS FOR APPROVAL. f TO PARTY CITY ROO ESS <br /> HVAC UNITS <br /> 4. CONTRACTOR IS TO BRING UP ANY DISCREPANCIES AND ITEMS WHICH ARE NOT SPECIFICALLY CALLED <br /> FOR OR SHOWN BUT ARE REQUIRED FORA COMPLETE MECHANICAL SYSTEM AND AFFECT HIS CONTRACT EXISTING GAS PIPING TO I; <br /> MECHANICAL-ELECTRICAL <br /> PRIOR TO ENTERING AND SIGNING THE CONTRACT; AFTER AWARDING THE CONTRACT ALL SUCH ITEMS BE REUSED --- --- CIVIL,-LEID_STRUCTURAL <br /> REQUIRED FORA COMPLETE SYSTEM READY FOR THE OWNER'S USE SHALL BE FURNISHED ---"\ FIRE PROTECTION <br /> AND INSTALLED INCLUDING ALL SUCH DISCREPANCY ITEMS MENTIONED ABOVE, AT NO ADDITIONAL COST <br /> TO THE OWNER AND PER LOCAL CODES. MANUFACTURER'S RECOMMENDATIONS AND APPLICABLE j \ 2100 112TH AVE. NE <br /> BELLEVUE, WA 98004 <br /> STANDARDS WITH THE ARCHITECT/ENGINEER'S APPROVAL. Lr.\`� \J f \ \ <br /> g i iii%ifiiiiiir�sayi iii oo�oiai_l�lO/O//aoiaiiaiols"-moi r•�G//io.,ro� i --- -�{ ;1 \ <br /> 5. ALL EQUIPMENT/FIXTURES SUPPLIED FOR THESE SPECIFICATIONS SHALL BE FREE FROM DEFECTS IN MATERIAL, _ OFFICE: (425)462-9441 <br /> AND TITLE ' -_- I RTU / FAX (425)462-9451 <br /> WORKMANSHIP, ,AND SHALL BE OF THE KIND AND QUALITY DESCRIBED HEREIN. IF IT G <br /> APPEARS WITHIN ONE YEAR FROM DATE OF FINAL ACCEPTANCE THAT EQUIPMENT DOES NOT MEET THE I` �� )\2 I �7 <br /> R - I6 <br /> WARRANTIES ABOVE,THE CONTRACTOR SHALL IMMEDIATELY CORRECT ANY DEFECT AND SHALL RESTORE _z L---- I �,_ ,____ 0 ENTAIL: <br /> �' y I % \ CService®abossein.com <br /> THE SYSTEM TO THE ORIGINAL CONDITIONS AT HIS EXPENSE. THE FOREGOING WARRANTY I` j"%i �,�� <br /> IS EXCLUSIVE AND IN LIEU OF OTHER WARRANTIES, WHETHER WRITTEN, ORAL, IMPLIED OR STATUTORY. <br /> NO WARRANTY OF MERCHANT ABILITY OF FITNESS FOR PURPOSE SHALL APPLY. (THE WARRANTY SHALL ; O ! WEBSITE: <br /> / <br /> START FROM THE TIME OF ARCHITECT/ENGINEER'S FINAL ACCEPTANCE.) 1 <br /> .5"/ R3U www.abossein.com <br /> 1 <br /> 6. ENTIRE INSTALLATION OF ALL EQUIPMENT, FIXTURES, PIPING, PLUMBING AND RELATED ACCESSORIES <br /> SHALL BE PER OWNERS' STANDARDS. MECHANICAL CONTRACTOR IS TO FAMILIARIZE HIMSELF i <br /> 1-..:i-- 11 <br /> �\ <br /> WITH THESE STANDARDS. I � \ <br /> 1-1/4"GAS LINE DROP DN I --__ I� <br /> 7. COORDINATE WITH THE STRUCTURAL ENGINEER TO PROVIDE STRUCTURAL SUPPORT FOR ALL EQUIPMENT. 0 <br /> INTO SPACE WITH SHUT OFF � \ � :_ �" <br /> 8. COORDINATE THE CONSTRUCTION SCHEDULE WITH THE OWNER AND PERFORM ALL REQUIRED WORK IN VALVE FOR TENANT 199 MBH ' -411k,7-7-\\ 1---,' <br /> ,���.�GAS WATER HEATER. AY' 6) <br /> ` off, <br /> STRICT ACCORDANCE WITH THE OWNER'S SCHEDULE. ° /-NEW GAS PIPING .. - - - <br /> 9. PLUMBING CONTRACTOR SHALL PAY FOR AND OBTAIN ALL REQUIRED PERMITS AND CERTIFICATES REQUIRED <br /> I '%� �� 4W,1411C: <br /> BY THE AUTHORITIES HAVING JURISDICTION ! <br /> I <br /> EXISTING GAS PIPING TO <br /> 10.ADJUST ALL EQUIPMENT AND PERFORM A COMPLETE WATER-BALANCING AND PUT ALL PLUMBING SYSTEMS IN BE REUSED I 21891 /� <br /> OPERATION. - .-.... �.. �' <br /> f <br /> 11.AIR-CONDITIONING UNIT COIL WITHOUT INTERNAL TRAP SHALL HAVE A P-TRAP (3" MIN. SEAL) FOR THE --- '•75 :N, <br /> CONDENSATE PAN. DISCHARGE CONDENSATE DRAIN TO ROOF DRAIN. 0 1 \ <br /> 413) <br /> \ li <br /> 12. PLUMBING CONTRACTOR SHALL VISIT THE SITE TO DETERMINE THE EXACT IMPACT OF THE NEW CONSTRUCTION 6"CAPPED ROOF JACK FOR I - - <br /> FOR THE PLUMBING SYSTEM AND SHALL INCLUDE IN HIS BID ALL THE WORK WHICH MIGHT NOT BE SPECIFICALLY i I TENANT 6"0 TYPE B VENT FOR <br /> MENTIONED BUT ARE REQUIRED FOR A COMPLETE PLUMBING SYSTEM READY FOR OWNER'S BENEFICIAL USE. I \ .__________ __________ <br /> i ;! WATER HEATER <br /> � j ° <br /> 0. <br /> , I <br /> 13. SCOPE OF WORK: ; - <br /> li <br /> THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL THE COST RELATED TO INSTALLING NEW PIPING AND I I I _sg �, ._-_--.-._-_-_--__- -___--_`,�- .-__-_--__----____--..___.. __.___---- 9. .� <br /> r <br /> NEW FIXTURES AS SHOWN AND AS REQUIRED BY THE UNIFORM PLUMBING CODE AND THE LOCAL I NOTE: �' I I / ° ® Z <br /> � <br /> JURISDICTIONS. ALL PLUMBING SYSTEM (PIPING, FIXTURES, EQUIPMENT, ETC.) INSIDE THE BUILDING SHALL --- ALL EXHAUST AND PLUMBING VENTS SMOKE DUCT \ <br /> Mir SHALL BE A MINIMUM OF 10 FT FROM !I DETECTOR °yy./ <br /> Pt <br /> BE NEW AND CONNECT TO NEW SANITARY AND NEW WATER PIPES OUTSIDE THE BUILDING. ii_ <br /> \ c n �1 <br /> -, OUTSIDE AIR INTAKES (TYPICAL) C til I a.,i <br /> THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL THE COST RELATED TO INVESTIGATING THE ROUTING c..D \ CD <br /> OF SITE UTILITY PIPES IN ORDER TO MAKE NEW CONNECTIONS FOR THE NEW FIXTURES. (THE PIPE RTU I ''N'N'\":%"" <br /> : igar \ , _--______--- <br /> ROUTING AND CONNECTIONS MAY NOT BE SPECIFICALLY SHOWN ON THE DRAWINGS) ° In \ <br /> 1-4 <br /> - <br /> THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL THE COSTS REQUIRED FOR ALL THE PIPING TO G G G 0 144 <br /> m ID <br /> 44 <br /> MEET THE PIPE SIZES PER THE UNIFORM PLUMBING CODES APPENDIX A - NEW GAS PIPING �1 <br /> 14. SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL SCOPE OF WORK, INSTRUCTION TO --- --- -\ _ _ \-I ® \ <br /> A <br /> BIDDERS AND EXACT LOCATION OF ALL FIXTURES. J �� s--\_:\ ° <br /> rg <br /> 15. COORDINATE EXACT LOCATION OF ALL EQUIPMENT, FIXTURES, PIPING, ETC. AND PENETRATIONS WITH -- ---- / R iU -- \__ \ <br /> \ r-i <br /> THE _____1,/EW GAS PI G-� \ �,r, ; 411) COO 14., 1 <br /> =, <br /> ARCHITECTURAL STRUCTURAL AND AT SITE. <br /> 16.ALL APPLICABLE CODES AND LOCAL JURISDICTION REGULATIONS SHALL SUPERSEDE THE CONSTRUCTION 1 !I j ) \ <br /> DOCUMENTS IF THEY ARE MORE STRINGENT. / <br /> rT� \ <br /> 17. INSTALL ALL TRAP ARMS SUCH THAT THE MAXIMUM LENGTH WILL NOT EXCEED THE CODE REQUIREMENTS. ! j \ ` <br /> 1 <br /> .,,N\ <br /> 18.ALL FIXTURES REQUIRING PLUMBING SHALL BE CONNECTED TO BUILDING WASTE, VENT, COLD WATER AND HOT I 1 I I (Tr I /J C Er i \\ <br /> WATER SYSTEM AS REQUIRED BY THE CODES. - �-� / \ ,� Z <br /> 19. INSTALL CLEANOUTS PER THE 2009 UPC-SECTION 707 AND AS REQUIRED BY LOCAL JURISDICTIONS. ;I i I '\ \ PP\\ <4 <br /> 20. PIPE MATERIAL: I /` <br /> of <br /> COLD WATER & HOT WATER COPPER "L" (ABOVE GROUND)(LEAD FREE) " ( ® I- <br /> \ <br /> /2.5"/-\ • 'N"7' ,,ULTA AUTY SUPPLY-GAS SUB-METER. \ Ey Z 1 <br /> THROUGH ROOF_TO GOOSENECK NEW GAS PIPING /1.0" LANDL EXIT CORRIDOR-GAS SUB-METER. <br /> JOINTS - TfRMfi�AitOtV�TfRMfNAT€-DtlOT1A� RK -I J \ FUTU FpOD COURT TENANT GAS SUB-METER. <br /> NOTE. AND METHOD OF CONNECTIONS SHALL BE PER THE 2009 UPC CHAPTER #14, ASTM STANDARDS 24" BELOW ROOF STRUCTURE R I G _ PAR �1 -GAS SUB METER. <br /> AND MANUFACTURERS RECOMMENDATIONS FOR EACH PIPE TYPE AND APPLICATIONS. TENANT'S FINAL CONNECTION !1 I A -G _ -------_____________G_______________________ _-----_. ___---__.- ____G______ --------\„ �EXISTI I6 .\' LORD'S <br /> J <br /> fPLI <br /> - - _ GAS M d <br /> L o ���5700A'/ 1 r%'ill lG �l�l !//l�/��' O 4�////Y.%GU/.'l�� U o�V.�:L H Y/1/�'' -%i� ���/ %lL: '/!✓iV ��� <br /> 41) <br /> 21. PIPE INSULATION: r �� ��i lam _- - -_ -__ --_==-- ° - `1 ERS D s TENANT <br /> " I 1-- " NEW GAS PIPING -�-, 25� - -- <br /> COLD WATER 1/2 INSULATION WITH VAPOR BARRIER JACKETS. (-RD <br /> -.,-,'- <br /> I <br /> 25� \ I <br /> it i W g <br /> HOT WATER - 1" INSULATION WITH VAPOR BARRIER JACKETS. FOR RUNOUTS UP TO 12 H <br /> FEET AND 1" INSULATION FOR ALL PIPING UP TO 2" DIAMETER. ��/00: Z II --- <br /> I I <br /> UNDERGROUND PIPING WITH 1/2" CLOSED CELL FOAM INSULATION. I 1 I I <br /> I g <br /> 22. PIPE HANGERS AND SUPPORTS: Lh I I <br /> i. I I! <br /> PIPE HANGERS AND SUPPORTS SHALL BE IN STRICT ACCORDANCE WITH THE 2009 UPC-SECTION-314 AND PIPE ! I I j I I ri) <br /> MANUFACTURERS RECOMMENDATIONS. ALL PIPES SHALL BE SEISMICALLY RESTRAINED PER LATEST EDITION �._-j I I I I I I \� o <br /> OF S.M.A.C.N.A. SEISMIC RESTRAINT MANUAL AND AS REQUIRED BY LOCAL JURISDICTION. - - LCD <br /> - <br /> riff �.,,r. .r� of,,,, 7:97.W.i rr� 0 I <br /> 23.THE CONTRACTOR SHALL INCLUDE ALL EXCAVATION AND BACKFILLING REQUIRED FOR UNDERGROUND = I I <br /> WORK IN HIS BID UNLESS OTHER ARRANGEMENTS ARE MADE WITH THE GENERAL CONTRACTOR PRIOR , a <br /> TO BIDDING. (COORDINATE WITH SITE CIVIL ENGINEER). _Ivi i <br /> 24. DOMESTIC HOT WATER SYSTEM SHALL BE SET FOR 120'F OR AS REQUIRED BY LOCAL JRSD. --__ a Li <br /> I psI L � I'� __.__�_._______:_______ <br /> 25.ALL WATER LINES SHALL BE STERILIZED IN ACCORDANCE WITH THE A.W.W.A. STANDARDS AND LOCAL REGULATIONS. I \ __ _ �� <br /> 26. ALL MATERIALS USED SHALL BE NEW AND BEAR U.L. LABEL WHEN REQUIRED. I 7\ <br /> =\ % \ <br /> 27. FINAL AS BUILT DRAWINGS SHALL BE SUBMITTED TO ENGINEER/OWNER. jam: ii�\ \ / <br /> \) -- <br /> 28. <br /> ALL OPENINGS AND PENETRATIONS THROUGH ROOF AND/OR WALLS SHALL BE PROPERLY SEALED, \ice j,' Z <br /> WEATHERTIGHT, AND AESTHETICALLY ACCEPTABLE. /% �;\/ <br /> 29.ALL CUTTING AND PATCHING REQUIRED FOR INSTALLATION OF NEW EQUIPMENT, FIXTURES AND PIPING \� �� <br /> TO BE BY CONTRACTOR. \ \/ / 0-4 <br /> 30. INSTALL AIR CHAMBERS BEHIND EACH OUTLET OR WADE-SHOKSTOPS FOR EACH FIXTURE GROUP AND WATER --_ <br /> HAMMER ARRESTORS AS SCHEDULED. i\� I <br /> ,----- \ <br /> 7 s I N i �i C <br /> „.--e",,\--------4,\ 7. I <br /> , <br /> ji 1 \ I I<,, <br /> LENGEND AND ABBREVIATIONS \\ \ I k\\ <br /> trI Z <br /> SYMBOL ABBR DESCRIPTION SYMBOL ABBR DESCRIPTION a <br /> 1"I COLD WATER PIPE --- CW COLD WATER PIPE <br /> 1" HW HOT WATER PIPE HOT WATER PIPE - - V VENT <br /> 0 <br /> 4" WASTE/SANITARYU PIPE SIZE W/SS WASTE OR SANITARY SEWER PIPE O <br /> 2" VENT PIPE SIZE ' GV GATE VALVE ROOF OF PLAN -- HVAC a <br /> CW BALL VALVE <br /> SCALE: 1/8"= 1'-0" <br /> P1 PLUMBING FIXTURE TAG _ A <br /> �- VTR VENT THRU ROOF ___ <br /> Q PLAN NOTE #1 ,J BURIED PIPE NORTH M <br /> H FCO FLOOR CLEANOUT -R- CHECK VALVE <br /> 0.5" 1/2"PIPE SIZE CONN CONNECT <br /> 0.75" 3/4"RPE SIZE Revisions: Date: <br /> 1" 1"PIPE SIZE TEMP TEMPREATURE <br /> 1.25" 1-1/4"PIPE SIZE PERMIT SET 8/3/12 <br /> 1.5" 1-1/2"PIPE SIZE PRESS PRESSURE <br /> 2" 2"PIPE SIZE EXIST EXISTING <br /> 2.5" 2-1/2"PIPE SIZE TYP TYPICAL <br /> 3" 3"PIPE SIZE <br /> DN DOWN <br /> o- PIPE ELBOW UP GPH GALLONS PER HOUR <br /> o- PIPE ELBOW DOWN <br /> -o- PIPE TEE UP GPM GALLONS PER MINUTE <br /> -e- PIPE TEE DOWN <br /> Job No.:212080 <br /> Date: <br /> P2.0 1 <br /> I OF 3) <br /> 1402 SE Everett Mall Way, B1208-010 <br />