Laserfiche WebLink
(d) FEES FOR POWER: For each circuit supplying motor horsepower, <br /> 1 generator kilowatts, rectifier kilo-volt amperes or welding outfit <br /> kilo-volt amperes, industrial electric furnace kilo-volt amperes <br /> 2 1. or industrial heat application kilo-volt amperes, and the like <br /> (including controlling and distributing apparatus), the inspection <br /> 3 fee shall be determined by the capacity or rating of the equipment <br /> in accordance with the following table: <br /> Not more than 6 $ 1.00 <br /> 5 Not more than 15 2.00 <br /> Not more than 25 3.00 <br /> 6 Not more than 50 4.00 <br /> Not more than 100 5.00 <br /> 7 Not more than 200 7.00 <br /> All over 200 10.00 <br /> 8 <br /> (e) For inspection of electrical apparatus for which no fee is <br /> 9 herein prescribed, payment shall be made at the rate of $5.00 per <br /> call, <br /> 10 <br /> (f) Whenever an inspector is called upon to make a re-inspection <br /> 11 for work that has been rejected the second time, a fee at the <br /> rate of $3.00 per call will be charged. The fee must be paid <br /> 12 before the re-inspection can be made. <br /> 13 (g) In the event a person, firm or corporation shall commence <br /> work without securing a permit, the applicant shall pay the sum of <br /> 14 $10000 or double the regular permit fee, whichever is greater, <br /> before a permit shall be issued. <br /> 15 <br /> Section ).1: ELECTRICAL WORK - INSPECTION REQUIRED. <br /> 16 No electrical wiring or equipment subject to the requirements of this,. <br /> ''ordinance shall be concealed until an inspection is applied for under this <br /> 17 ;Ordinance, and an inspection made and the work approved by the inspector making <br /> (such inspection. <br /> 18 <br /> Upon the completion of such work, it shall be the duty of the person <br /> 19 ;doing the same to notify the City Electrical Inspector within twenty-four <br /> hours after the completion of said work. The City Electrical Inspector shall <br /> 20 Iet once proceed to inspect the same, and if said work is in all respects in <br /> `:conformity with the provisions of this chapter, he shall issue a certificate of <br /> 21 jifinal inspection, which shall contain the date of said final inspection. No <br /> electric current shall be turned on such electrical equipment, and no elec- <br /> 22 Arical equipment put into service until such certificate be issued. <br /> 23 <br /> 24 ;' <br /> 25 <br /> 26 I. <br /> 27 <br /> 28 <br /> 29 <br /> 30 <br /> 31 <br /> 32 ' -6- <br />