My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1605 SE EVERETT MALL WAY WALMART 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1605
>
WALMART
>
1605 SE EVERETT MALL WAY WALMART 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2019 10:22:24 AM
Creation date
10/25/2019 10:03:21 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1605
Tenant Name
WALMART
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Seattle,Washington <br /> j = , , www206.522.paclan.9510d.com <br /> T <br /> TURNING VISIONS INTO REALITY <br /> 7. Install appropriate inlet protection devices for paved areas as work progresses. <br /> 8. Complete grading and installation of permanent stabilization over all areas including out lots. <br /> 9. Obtain concurrence with the construction manager that the site has been fully stabilized then: <br /> a. Remove all remaining temporary erosion and sediment control devices, <br /> b. Stabilize any areas disturbed by the removal of BMPs,and <br /> c. Ask the construction manager to contact the civil engineer to complete the NOT <br /> site inspection and report. <br /> 10. Continue Daily Inspection Reports until the Final Daily inspection report, marked 'Ready to <br /> Terminate Permit', is signed by the construction manager and submitted. <br /> NOTE: The General Contractor may complete construction-related activities concurrently only if all <br /> preceding BMPs have been completely installed. BMP-related steps in the above sequence are <br /> italicized for clarity. <br /> V. Source Control Plan <br /> See Appendix A for a copy of the Source Control Activity Worksheet, obtained from <br /> Chapter 2 of Volume IV of the Manual. <br /> The activities listed on the activity worksheet that will be performed outdoors are listed <br /> below: <br /> Activity A3.2 — Concrete Pouring, Concrete Cutting, and Asphalt Application at Temporary <br /> Sites <br /> Summary of Required BMPs: <br /> Employees must be educated on the pollution hazards of concrete and asphalt application <br /> and cutting, debris must be swept up and not hosed down the storm system and <br /> downstream storm drains must be protected from concrete activity. <br /> Proposed Methods to Comply with Required BMPs: <br /> The project C-SWPPP will specifically note the Contractors responsibility regarding <br /> concrete work, including requirements listed in the Washington Department of Ecology <br /> General Permit for Construction Stormwater Discharges which does not allow concrete <br /> wastewater to contact stormwater. Designated, contained concrete washout areas will be <br /> required. <br /> Activity A3.6 — Landscaping and Vegetation Management Activities <br /> Summary of Required BMPs: <br /> Do not dispose of collected vegetation into stormwater drainage system, use mulch, and <br /> maintain appropriate oil and chemical spill cleanup materials if oil or other chemicals are <br /> handled. <br /> Proposed Methods to Comply with Required BMPs: <br /> Landscape maintenance activity will be contracted by the owner with a nationally <br /> recognized landscape contractor. Waste vegetation shall be properly disposed of and the <br /> proposed landscape will utilize xeriscape principals therefore reducing the need to use <br /> Everett Mall Plaza Parcel III Retail Expansion Stormwater Site Plan — Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.