Laserfiche WebLink
• Seattle,Washington. <br /> 111T www.paclan206.522.9510d.com <br /> TURNING VISIONS INTO REALITY <br /> pesticides and herbicides. If chemicals are needed, the landscape maintenance contractor <br /> shall comply with manufacturer guidelines. <br /> Activity A4.4 — Storage of Solid Wastes and Food Wastes <br /> Summary of Required BMPs: <br /> Solid and food waste must be stored in suitable containers with leak-proof lids. Employees <br /> must check for leaks frequently. Additionally, catch basins on the property that receive <br /> drainage from the waste storage area must be cleaned out. <br /> Proposed Methods to Comply with Required BMPs: <br /> The project will utilize a compactor that is fully enclosed, with internal drainage routed to <br /> the sanitary sewer system as needed. Organic waste will be collected in metal trash bins, <br /> with leak-proof lids. The catch basins that receive drainage from this organic waste area <br /> will be included in the on-site operation and maintenance requirements, which will note <br /> the requirement listed above to clean out the catch basins. <br /> 111 Activity A4.10 — Storage of Pesticides, Fertilizers, or other products that can leach <br /> pollutants <br /> Summary of Required BMPs: <br /> Employees must be trained on the proper storage, handling, application and disposal of <br /> fertilizers and pesticides. Additionally storage areas of pollutants and treated lumber must <br /> be covered and drain to a sump or a holding tank for cleaning once a year. <br /> Proposed Methods to Comply with Required BMPs: <br /> p P <br /> Based on initial coordination, the proposed garden center will address this item in one of <br /> two ways: (1) All external storage of products that can leach pollutants will be covered <br /> and drain to a sump as required or (2) all products that can leach pollutants will be stored <br /> inside and not exposed to stormwater. <br /> Activity A4.9 — Parking and Storage for Vehicles and Equipment <br /> No additional "Activity Specific BMPs" are required for this activity due to the fact that the <br /> project is not classified as a high-use site per Volume I, Chapter 4.3 of the manual. The <br /> project Traffic Assessment, by the Transpo Group, estimates the site will generate <br /> approximately 53 daily trips. This is less than the high use site classification of 100 daily <br /> trips. <br /> Activity A5.2 — Building Repair, Remodeling, and Construction <br /> Summary of Required BMPs: <br /> Employees must be educated on the pollution hazards of site activities and trained in spill <br /> control procedures. Spill cleanup materials must be available at all times onsite. The site <br /> must be cleaned up and swept at the end of each workday. No substance, other than <br /> water only, can be dumped on the pavement or toward storm drains. In summary, <br /> generally good 'housekeeping' must be practiced at all times during construction. <br /> Proposed Methods to Comply with Required BMPs: <br /> Everett Mall Plaza Parcel Ill Retail Expansion Stormwater Site Plan Page 15_ <br />