My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4085
>
Ordinances
>
Ordinance 4085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2019 10:49:18 AM
Creation date
10/29/2019 10:48:08 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4085
Date
5/4/1965
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • <br /> contractor accordingly. Such charges for water shall be considered to <br /> operate as a materials lien against the contractor if unpaid. A reasonable <br /> meter rental charge for use of any meter furnished by the Water Department <br /> to measure water used in connection with such contracts may be added to the <br /> billing for water consumed including repair of any damage done to the meter. <br /> Section 60: Construction Water Use - Buildings. <br /> a. Metered: In the case of water consumed during construction <br /> of a building or structure which, upon completion, would be served <br /> through a metered connection, the amount of water so consumed <br /> during construction shall be paid for by the contractor or owner at the <br /> applicable metered rate. If a metered service is not installed to the <br /> premises during the initial stage of construction, the amount of <br /> water consumed between the commencement of construction and the <br /> installation and turn on of the metered service shall be estimated by <br /> the Superintendent and the charge added to the cost for installation <br /> of the service connection, or added to a subsequent water billing to <br /> the premises. <br /> b. Fixed Rate: In the case of water consumed during construction <br /> of a residence which, upon completion, would be eligible for a fixed <br /> rate service, there shall be no charge other than the fixed rate <br /> charge, provided the service connection is installed and turned on <br /> during the initial stage of construction. If an application for a <br /> service connection is made for such premises near the end or after <br /> completion of such construction, a charge in the amount of Five <br /> Dollars ($5. 00) shall be made and paid as an addition to the cost <br /> for installation of the service connection, or added to a subsequent <br /> water billing to the premises. <br /> Section 61: Special Water Use - Approval Required. Any and all <br /> other special uses of water from the Water System not included above nor <br /> elsewhere in this Ordinance shall be reviewed prior to such use and the <br /> -29- <br />
The URL can be used to link to this page
Your browser does not support the video tag.