<br /> ', *PROJECT NOTES-qn
<br /> �' 1. Remove e�asting coping-install new coping and snap lock �
<br /> i � I � flashing per detail-typical at all sides of the building unless noted � I �
<br /> ; otherwise �
<br /> 2. Area of reduced parapet height(5"approximate clr ht)apply new
<br /> � coping per detail
<br /> � 3. Existing coping at entry curtain wall glazing to remain-tie to new G V N D ���O�
<br /> ! coping per detail � � I I
<br /> I � 4. � Low roof beyond-prep and install new roof overlay-material to
<br /> match existing system-verify carlisle epdm with decorative •
<br /> ballast, coping and associated wall flashings per details Y U 1 L D 1 N G �
<br /> 5. Existing entry canopy beyond-basic scope-remove existing
<br /> Kalwall and store for re-use.As necessary to install the new BASIC WORK-EIFS CLADDING
<br /> I I I work-Cut and remove 1 ex isting sloped frame against the � ���`---`"�.,.,..� � � �
<br /> exterior wall-Re-assemble and reinstall following cladding work. �--- �����D
<br /> i _Substitute new AEP span Select seam narrow batten roofing_ _ _ _ -- A. _Remove existing cladding(including stone plinths _ _ _ _ Q
<br /> ��
<br /> — � as several locations around the building.) and �C7
<br /> — — — — panels for existing corrugated metal roofing panels --�ti „
<br /> I 6. New sloped sill-AEP Span flush metal or Select Seam Narrow - � �---_ �- ,: sheathing to expose e�sting framing and 6 batt
<br /> '� Batten panels-carry tight to e�erior wall(with windows)tuck _ B '�- , � � insulation. �
<br /> below existin window sill flashin extend as necessa Ca - --.A ` {� " � B. Install new 5/8"Dens Glas Gold sheathing and 3927 Rucker Ave Everett Wa
<br /> I g g- ry' m I - -._ ';,'f �,� approved wet applied wrb materials(same as at � � '
<br /> � � � projected sill across intermediate columns at contiguous recessed �� , i � �� � eifs) �
<br /> �, window conditions-Continuous head flashing at the top of � �-- r,� ,.�,,��, �'� � � C. Install new AEP Span Select Seam standing seam
<br /> � contiguous window recesses placed at intersection of soffit and � -- a" � � : ��� �.,; metal anel claddin -assume 20"wide anels,
<br /> I rec ssed window locations. " � � � ; ��; '°�� p g p
<br /> furthest extenor wall. Typical at a I e � -_ �, ,
<br /> Q �_. � I� i � � centered-run continuous across all contiguous
<br /> ' Sill- 7. Existing bus stop-temporarily remove exisiting railing- reinstall � � � [ ,��' �;�s window recesses. , I
<br /> ', � following completion of the work in that area. Coordinate with � `� ' " `' � D. Install new Dryvit Outsulation MD system in
<br /> , I I Community Transit. � B�� � ,�� �'� �>.�
<br /> ', 8. Excavate along builidng-6-12"down 8"min from bldg- place � -.,,�.;� � t ��r thicknesses noted on the drawings-
<br /> retaining mtls per detail,drain pipe and drain rock to maintain ;�I , �
<br /> �3;r,�� • Refer to Dryvit details OPMD 0,0,01, 02
<br /> I {k and 06/A3-02 for typical manufacturer's
<br /> iseparation fram bottom of cladding to grade.Tie to e�sting �'�� � = details � 1 A2-01
<br /> � A2-02 2 footing drain-Altemately provide 12"diameter drywell 2'deep in '
<br /> � landscaping.Det 02/A3-01.b � � ( � • assume two finish colors-i �
<br /> I I • Install precast concrete accent panels at
<br /> a. Minor adjustment of existing grade at building to create
<br /> drainage swale at area indicated to the south side of the the three buildin g entrances as indicated.
<br /> . — — — — — — — — — — — — buildin9• — — — — — — — — — � — — — — — ��
<br /> 9. Typical recladdin work below e�sting curtain wall element.
<br /> 10. i coo ' es a ensi ' to r ' pera'ona! BASIC RECLADDING WORK � �
<br /> ' � � during all constructio activities. lash existin sheet met cover I 1/4�� = 1�-0'�
<br /> ' Canopy-pn-5 - with new sheet metal flashing per detail 04/A3-01 b
<br /> 11. Temporarily remove exisitng canvas canopy at 1st flr East si e- �4 25 18 �
<br /> Reinstall at completion of work
<br /> ', 12 Sign Location-confirm location of mounting points for the _ _ _ _ — — — — — — — — C 5
<br /> Low Roof-pn-4 e�asting sign to be reinstalled-coordinate with owner. Trea "EIFS"NOTE For Construction
<br /> _�-, � I � � mounting points in conformance with Dryvit details. I � (
<br /> 13. Own t onfirm e 'ment s� e d rou ning r ' ed for Use of the EIFS label on these drawings relates directly to the
<br /> t 1 ceme . Ve t walt ' g is fr to this specified Dryvit system:Outsulation Plus MD System. The details
<br /> criteria,and modify as required to conform if not.This minimally contained on sheets A3-02,A3-03 and A3-04 are the manufacturer's
<br /> ' requires a head track at the top and double studs at the jambs of standard details for a wide range of conditions that exist at the
<br /> ��I � \ ; the required opening. Gunderson building. These details illustrate the typical application
<br /> � � I', � 14. � Continuous metal flashing at transition from 4"to 2"rigid � and installation requirements for the specified product. Other project � ��� ���N������
<br /> , � \ ' insulation aligned with the bottom sill condition of the first floor specific details or scope notes that may conflict with the requirements ��,������'�' !
<br /> !, windows. Typical-refer to detail A3-01 a of these standard details will be brought to the attention of the
<br /> ' \ — — — — — — — — — 15 _Contino eal ali ith the ashing 'ions at — Architect for clarification and resolution.� _ — _ — _ _ _ _ _
<br /> reces the 2n rd floo detail 0 - 1a 69
<br /> ; 16. Paint concrete sidewalls and rails at level landing to existing � � ,r �
<br /> I � � garage and the curved connecting stair. � �� �
<br /> ' 17. P int all exteri r hollow met I doors in are s of new EIFS to EIFS NOTE
<br /> \ tch ne colors i al 1/4" = 1'-0"
<br /> F�ALPI-� 1�'. �L�.L�fV
<br /> I� * ' ' in this
<br /> � 1� Pro�ect notes are referenced from multiple drawings ����� �'F �+d�����fiQ��
<br /> pn-16 � � � � I drawing set. � I I
<br /> f
<br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - B4
<br /> 0 i i i i i i � -
<br /> Canopy-pn-5 —
<br /> rev-1 - date-topic addendum 1 -05 0918
<br /> I I I I I I I rev-2-tlate- topic
<br /> � — — — — — — — — — — — — — — — — — — — — — — — — — A7 rev-3-date- topic
<br /> � rev-4- date-topic
<br /> I I I I I I I
<br /> � s�ii- rev-5-date- topic
<br /> I 01
<br /> ( 3-01 rev-6- date-topic
<br /> � I I I I I I I
<br /> � - - - - - A1
<br /> - - - - - - - - � __ _ _ _ _ — _ _� . _ ___� ____
<br /> � I I I � � � drainage irection � � Drainage pn-Sa
<br /> o ' "
<br /> Bus Stop-pn-7 �
<br /> I I I I I I I I .
<br /> 8 7 6 5 4 3 2 1
<br /> 2
<br /> I 59�_2"
<br /> A2-01 Verify length&slope of"gutter"
<br /> SEC�ND FLOOR PLAN
<br /> � LEVEL 2
<br /> � 1/8" = 1'-0"
<br /> I
<br /> i
<br /> �
<br /> �
<br /> '�
<br /> ���
<br /> , EVOLUTION
<br /> '� ARCHITECTURE - INC
<br /> � 6264 ELLIS AVE S `
<br /> Seattle, Washington,
<br /> ph 206 588
<br /> info@evolutionarchitecture.net
<br />
|