Laserfiche WebLink
' �� �`� ��������� . <br /> ', � �-0 <br /> �,: <br /> i I I A2-02 �.�"�� � ��� �� � ��� � � <br /> ' � � � � � � � � � <br /> � <br /> � <br /> � � � � � � � � ' <br /> - - - - - - - - - - - E8 . <br /> ' � � � <br /> � I I I <br /> ', *PROJECT NOTES-qn <br /> �' 1. Remove e�asting coping-install new coping and snap lock � <br /> i � I � flashing per detail-typical at all sides of the building unless noted � I � <br /> ; otherwise � <br /> 2. Area of reduced parapet height(5"approximate clr ht)apply new <br /> � coping per detail <br /> � 3. Existing coping at entry curtain wall glazing to remain-tie to new G V N D ���O� <br /> ! coping per detail � � I I <br /> I � 4. � Low roof beyond-prep and install new roof overlay-material to <br /> match existing system-verify carlisle epdm with decorative • <br /> ballast, coping and associated wall flashings per details Y U 1 L D 1 N G � <br /> 5. Existing entry canopy beyond-basic scope-remove existing <br /> Kalwall and store for re-use.As necessary to install the new BASIC WORK-EIFS CLADDING <br /> I I I work-Cut and remove 1 ex isting sloped frame against the � ���`---`"�.,.,..� � � � <br /> exterior wall-Re-assemble and reinstall following cladding work. �--- �����D <br /> i _Substitute new AEP span Select seam narrow batten roofing_ _ _ _ -- A. _Remove existing cladding(including stone plinths _ _ _ _ Q <br /> �� <br /> — � as several locations around the building.) and �C7 <br /> — — — — panels for existing corrugated metal roofing panels --�ti „ <br /> I 6. New sloped sill-AEP Span flush metal or Select Seam Narrow - � �---_ �- ,: sheathing to expose e�sting framing and 6 batt <br /> '� Batten panels-carry tight to e�erior wall(with windows)tuck _ B '�- , � � insulation. � <br /> below existin window sill flashin extend as necessa Ca - --.A ` {� " � B. Install new 5/8"Dens Glas Gold sheathing and 3927 Rucker Ave Everett Wa <br /> I g g- ry' m I - -._ ';,'f �,� approved wet applied wrb materials(same as at � � ' <br /> � � � projected sill across intermediate columns at contiguous recessed �� , i � �� � eifs) � <br /> �, window conditions-Continuous head flashing at the top of � �-- r,� ,.�,,��, �'� � � C. Install new AEP Span Select Seam standing seam <br /> � contiguous window recesses placed at intersection of soffit and � -- a" � � : ��� �.,; metal anel claddin -assume 20"wide anels, <br /> I rec ssed window locations. " � � � ; ��; '°�� p g p <br /> furthest extenor wall. Typical at a I e � -_ �, , <br /> Q �_. � I� i � � centered-run continuous across all contiguous <br /> ' Sill- 7. Existing bus stop-temporarily remove exisiting railing- reinstall � � � [ ,��' �;�s window recesses. , I <br /> ', � following completion of the work in that area. Coordinate with � `� ' " `' � D. Install new Dryvit Outsulation MD system in <br /> , I I Community Transit. � B�� � ,�� �'� �>.� <br /> ', 8. Excavate along builidng-6-12"down 8"min from bldg- place � -.,,�.;� � t ��r thicknesses noted on the drawings- <br /> retaining mtls per detail,drain pipe and drain rock to maintain ;�I , � <br /> �3;r,�� • Refer to Dryvit details OPMD 0,0,01, 02 <br /> I {k and 06/A3-02 for typical manufacturer's <br /> iseparation fram bottom of cladding to grade.Tie to e�sting �'�� � = details � 1 A2-01 <br /> � A2-02 2 footing drain-Altemately provide 12"diameter drywell 2'deep in ' <br /> � landscaping.Det 02/A3-01.b � � ( � • assume two finish colors-i � <br /> I I • Install precast concrete accent panels at <br /> a. Minor adjustment of existing grade at building to create <br /> drainage swale at area indicated to the south side of the the three buildin g entrances as indicated. <br /> . — — — — — — — — — — — — buildin9• — — — — — — — — — � — — — — — �� <br /> 9. Typical recladdin work below e�sting curtain wall element. <br /> 10. i coo ' es a ensi ' to r ' pera'ona! BASIC RECLADDING WORK � � <br /> ' � � during all constructio activities. lash existin sheet met cover I 1/4�� = 1�-0'� <br /> ' Canopy-pn-5 - with new sheet metal flashing per detail 04/A3-01 b <br /> 11. Temporarily remove exisitng canvas canopy at 1st flr East si e- �4 25 18 � <br /> Reinstall at completion of work <br /> ', 12 Sign Location-confirm location of mounting points for the _ _ _ _ — — — — — — — — C 5 <br /> Low Roof-pn-4 e�asting sign to be reinstalled-coordinate with owner. Trea "EIFS"NOTE For Construction <br /> _�-, � I � � mounting points in conformance with Dryvit details. I � ( <br /> 13. Own t onfirm e 'ment s� e d rou ning r ' ed for Use of the EIFS label on these drawings relates directly to the <br /> t 1 ceme . Ve t walt ' g is fr to this specified Dryvit system:Outsulation Plus MD System. The details <br /> criteria,and modify as required to conform if not.This minimally contained on sheets A3-02,A3-03 and A3-04 are the manufacturer's <br /> ' requires a head track at the top and double studs at the jambs of standard details for a wide range of conditions that exist at the <br /> ��I � \ ; the required opening. Gunderson building. These details illustrate the typical application <br /> � � I', � 14. � Continuous metal flashing at transition from 4"to 2"rigid � and installation requirements for the specified product. Other project � ��� ���N������ <br /> , � \ ' insulation aligned with the bottom sill condition of the first floor specific details or scope notes that may conflict with the requirements ��,������'�' ! <br /> !, windows. Typical-refer to detail A3-01 a of these standard details will be brought to the attention of the <br /> ' \ — — — — — — — — — 15 _Contino eal ali ith the ashing 'ions at — Architect for clarification and resolution.� _ — _ — _ _ _ _ _ <br /> reces the 2n rd floo detail 0 - 1a 69 <br /> ; 16. Paint concrete sidewalls and rails at level landing to existing � � ,r � <br /> I � � garage and the curved connecting stair. � �� � <br /> ' 17. P int all exteri r hollow met I doors in are s of new EIFS to EIFS NOTE <br /> \ tch ne colors i al 1/4" = 1'-0" <br /> F�ALPI-� 1�'. �L�.L�fV <br /> I� * ' ' in this <br /> � 1� Pro�ect notes are referenced from multiple drawings ����� �'F �+d�����fiQ�� <br /> pn-16 � � � � I drawing set. � I I <br /> f <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - B4 <br /> 0 i i i i i i � - <br /> Canopy-pn-5 — <br /> rev-1 - date-topic addendum 1 -05 0918 <br /> I I I I I I I rev-2-tlate- topic <br /> � — — — — — — — — — — — — — — — — — — — — — — — — — A7 rev-3-date- topic <br /> � rev-4- date-topic <br /> I I I I I I I <br /> � s�ii- rev-5-date- topic <br /> I 01 <br /> ( 3-01 rev-6- date-topic <br /> � I I I I I I I <br /> � - - - - - A1 <br /> - - - - - - - - � __ _ _ _ _ — _ _� . _ ___� ____ <br /> � I I I � � � drainage irection � � Drainage pn-Sa <br /> o ' " <br /> Bus Stop-pn-7 � <br /> I I I I I I I I . <br /> 8 7 6 5 4 3 2 1 <br /> 2 <br /> I 59�_2" <br /> A2-01 Verify length&slope of"gutter" <br /> SEC�ND FLOOR PLAN <br /> � LEVEL 2 <br /> � 1/8" = 1'-0" <br /> I <br /> i <br /> � <br /> � <br /> '� <br /> ��� <br /> , EVOLUTION <br /> '� ARCHITECTURE - INC <br /> � 6264 ELLIS AVE S ` <br /> Seattle, Washington, <br /> ph 206 588 <br /> info@evolutionarchitecture.net <br />