Laserfiche WebLink
City of Everett Coordination of SRO7 and SR08 CSO Control and Sewer"0"Project <br /> Client Responsibilities <br /> 1. When identified, authorize additional services in via email and/or in writing. <br /> Assumptions <br /> 1. Approximately twelve percent of the budget is established for additional services. <br /> Deliverables <br /> To be determined. <br /> Schedule <br /> Approximate project milestones are shown below. <br /> Project Notice to Proceed October 24, 2019 <br /> Model Calibration Technical Memorandum January 10, 2020 <br /> Draft Hydraulic Analysis Report February 14, 2020 <br /> Final Hydraulic Analysis Report March 20, 2020 <br /> Fee <br /> See the attached. <br /> I <br /> Scope of Services 7 <br /> CONSULTANTS <br />