Laserfiche WebLink
1 <br /> • Budget for final design meetings based on Consultant preparing for and attending a maximum <br /> of three(3) two-hour meetings to discuss design issues and design review comments. <br /> • The City shall be responsiblefor leading the construction bid solicitation process. <br /> • The City shall be responsible for producing bidding documents and coordination/submittal <br /> documents to on-line plan center,if applicable. <br /> • Labor and expense task level-of-effort budgets are estimates and consultant reserves the right to <br /> transfer unused task budgets to accomplish other service-task scope activities,if necessary,and <br /> only upon approval from the City. <br /> 3.0 Final Design - East Grand Improvements, Phase 2 <br /> The Consultant will design and prepare Final Plans,Specifications (project manual),and <br /> Construction Cost Estimates (PS&F•documents).Interim documents will be submitted to the City <br /> at 90%,and 100%(Proof-set) for review and comment. <br /> • <br /> 3.1 Prepare 90%Construction Plans, Phase 2 <br /> The Consultant will revise the previously prepared construction plans to a higher level of design <br /> completion,including incorporating the comments from previous design submittal. <br /> 3.2 Prepare 90% Project Specifications, Phase 2 <br /> The Consultant will revise the previously prepared specification document to a higher level of design <br /> completion,including incorporating the comments from the previous submittal. <br /> 3.3 Prepare 90% Construction Cost Estimate, Phase 2 <br /> The Consultant will revise the quantities and update the construction cost estimate.The <br /> construction cost estimate will include appropriate contingencies to reflect the level of design <br /> complete. <br /> • <br /> • <br /> 3.4 Submit and Respond to 90% Review Comments, Phase 2 <br /> Consultant will assemble and submit documents for review and comment,including meeting with <br /> the City to discuss design aspects and details of the submittal.The City shall review and provide <br /> Consultant a consolidated set of written review comments from all reviewers on a returned <br /> electronic form provided by the Consultant.Consultant will subsequently evaluate the comments <br /> and provide the City with written response to each comment for clarification and concurrence. <br /> 3.5 Design and Prepare 100% PS&E Documents, Phase 2 <br /> The Consultant will visually examine the project site to verify that site conditions have not changed <br /> since the time of initial site survey and notify/discuss any significant findings which may have an <br /> impact on proposed improvements.The Consultant will prepare construction plans,specifications, <br /> and construction cost estimate by completing final design and incorporating comments from <br /> Sewer System Replacement and Capacity Improvements Project 16 <br /> otak <br /> K\project\31500\31520\Contract\Amend4\AmendFour\AmendmentFoui021413.docx <br /> 17 <br />