I <br /> Project: Water Main Improvement"K"and Sewer Main Replacement <br /> Change Order No. 2 <br /> Change Order Effective Date:May 2,2013 <br /> inch PG 64-22 For Trench Patch placed,versus the original bid proposal quantity, as the result of an <br /> agreed design modification to the trench patching detail. <br /> Schedule B <br /> Bid Item 36–Revised HMA Patch Price. This bid item is being added to provide an equitable <br /> adjustment per WSDOT Standard Specification 1-09.4, due to the decrease in tonnage of HMA., CL 1/2- <br /> inch PG 64-22 For Trench Patch placed,versus the original bid proposal quantity,as the result of an <br /> agreed design modification to the trench patching detail. <br /> • <br /> Modified Bid Item under Schedule A <br /> Bid Item 5=-Traffic Control Labor. Additional hours of traffic control labor were used on this project <br /> above the original plan quantity anticipated by the Engineer. <br /> Exhibit C—Additional Contract Time <br /> Thirty Seven,(37),working days are being added as a result of this change order#2,due to unforeseen <br /> conditions that arose during the course of the contract work,for granting additional time for making a <br /> connection to a pressure reducing vault and for directing SRV notice to mobilize onto the Water Main <br /> L Improvements Project prior to Water Main K Improvements project was substantially completed,so <br /> work could begin on Water Main L Improvement project prior to winter weather settling in on that <br /> project. <br /> Page 4 of 4 <br /> 5 <br />