Exhibit A <br /> Continued <br /> The anticipated sheet list is as follows: <br /> No. of <br /> Sheet Title Scale Sheets <br /> Cover Sheet N/A 1 <br /> Legend and Abbreviations N/A 1 <br /> Project Survey Control Plan 1" = 50', DW 1 <br /> Existing Conditions, TESC, and Demolition 1" = 20', DW 1 <br /> Plan <br /> Dike Repair Plan and Profile 1" = 20' 2 <br /> Dike Repair Sections 1" = 20' H, 1"=5' 1 <br /> V <br /> Dike Repair Details Varies 2 <br /> Access and Haul Route Plan Varies 1 <br /> Total 10 <br /> Abbreviations used are: DW = Double window <br /> Deliverables <br /> • 90% Plans, five (5) hard copies at 11"x17" size, and electronic file (PDF file format). <br /> • 100% Plans, five (5) hard copies at 11"x17" size, three (3) hardcopies of full-size 22"x34" plans, <br /> and electronic file (PDF file format). <br /> • Electronic copy of CAD (AutoCAD format)files. <br /> Assumptions <br /> • Final design for the repair under 1-5 will consist of excavation of part of the landside of the dike, <br /> and replacing and extending the amount of dike fill on the land side to develop an adequate <br /> seepage barrier. The access road under the 1-5 will be maintained as wide as feasible, assuming <br /> that a 15' minimum width is required for access. <br /> • Design of a floodwall, or design for complete replacement of the dike under 1-5 is not included in <br /> this scope. <br /> • The design criteria for top elevation of the dike under 1-5 will be as high as practical given the <br /> space constraints from the elevation of the Interstate-5 bridge girders. The bottom elevation of <br /> the bridge girders generally ranges from 15.1' to 16.0' NAVD88, and therefore the top elevation of <br /> adequately compacted dike fill will be limited. <br /> 8.3 Technical Specifications for Repair Under 1-5 (90% and 100%) <br /> Otak will prepare technical special provisions, bid schedule, and assemble the project construction <br /> manual based on City standard "double-sided printing"format, Project Manual will include sections for <br /> contract and general/special provisions, bid proposal, contract, and applicable appendices. It is <br /> assumed that the City will provide the front-end contract(Division 0)for Otak to assemble the Project <br /> Manual. Specifications will be based on the City's standards and CSI standard specifications. <br /> Otak will revise the previously prepared Project Manual based on 90% review comments and prepare <br /> the 100% design specifications manual. <br /> Deliverables <br /> • 90% Project Construction Manual, electronic file (PDF file format). <br /> • Project Construction Manual at 100-percent design, sealed by a Washington state registered PE, <br /> three (3) hard copies, and electronic file (PDF file format). <br /> DD5 Dike Repairs and Improvements Project 4 <br /> ota k <br /> K•\project\32700\32758\Contract\Proposal 19_0317\Scope for Phase 2-DD5 dike repairs Under 1-5 and East of I-5_19_1014.docx <br />