My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CG Engineering 12/2/2019
>
Contracts
>
6 Years Then Destroy
>
2021
>
CG Engineering 12/2/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 11:09:44 AM
Creation date
12/3/2019 11:09:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
CG Engineering
Approval Date
12/2/2019
Council Approval Date
11/27/2019
End Date
12/31/2021
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
Design Improvements for Reservoir #3
Tracking Number
0002074
Total Compensation
$146,598.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- City of Everett review period is two (2)weeks <br /> Deliverables: <br /> - Electronic copy(MS Word) of Draft Technical Memorandum <br /> - Electronic copy(PDF) of Final Technical Memorandum <br /> TASK 4—COVER REPAIRS AND VENTILATION IMPROVEMENT DESIGN (estimated at$51,182) <br /> CG ENGINEERING: <br /> CG Engineering will provide structural engineering for the repair work and work incidental to the ventilation <br /> improvements. <br /> 4.1 Design kickoff meeting at Public Works office <br /> 4.2 50% Design Documents (targeted submittal date: 1/31/20) <br /> 4.3 90%Design Documents (targeted submittal date: 3/27/20) <br /> 4.4 Bid-Ready(Final) Design Documents (targeted submittal date: 5/1/20) <br /> Assumptions: <br /> - Front end specifications will be prepared by the City. CG Engineering and its subconsultants will be <br /> responsible for preparation of the technical specifications. <br /> - All required permits will be obtained by the City or general contractor <br /> - Final Design plans will be used for bidding <br /> Deliverables: <br /> - Plans, Cost Estimate, and technical Specifications in PDF format at the 50%, 90%, and Final stages of <br /> design <br /> MURRAYSMITH: <br /> Produce Final design plans and specifications for the project <br /> 4.1 50%Design Plans and Specifications. Specifications will be in CSI format. <br /> 4.2 90%Design Plans and Specifications. Specifications will be in CSI format. <br /> 4.3 Bid-Ready(Final) Design Plans and Specifications. Specifications will be in CSI format. <br /> 4.4 Construction Cost Estimates (50%, 90%and Bid-Ready design). <br /> 4.5 Constructability Reviews <br /> TASK 5—BID PHASE SUPPORT(estimated at$10,0371 <br /> CG ENGINEERING: <br /> CG Engineering will provide consultation to the City staff to assist with the bidding phase for the <br /> elements of the project that pertain to our scope of work. <br /> 5.1 Attend pre-bid conference <br /> 5.2 Respond to bid phase RFIs (not to exceed 8) <br /> 5.3 Prepare one addendum <br /> 5.4 Maintain a written record of bid-phase communications <br /> Assumptions: <br /> - The City will be responsible for preparation and advertisement of all bid documents. <br /> Deliverables: <br /> - Written RFI responses, if necessary <br /> - Plans for Addendum in PDF format, if necessary <br /> Exhibit A—Scope of Work Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.