Laserfiche WebLink
Mr.Dean Shaughnessy <br /> City of Everett Parks and Community Service <br /> October 23,2019 <br /> File No.2042019.913.036 <br /> 2 <br /> (b) Site visit to review conditions and meet with City staff—perform a <br /> visual site visit to verify asphalt paving conditions and determine <br /> limits of asphalt pavement repairs and to review general site <br /> configuration at the boat ramp facility. Meet on site at the same <br /> time with City staff to discuss the project and overall project goals <br /> and objectives. <br /> (c) Approach wedge and boat ramp float design—perform design <br /> calculations and prepare drawings and technical specifications for <br /> the demolition and replacement of the existing concrete approach <br /> wedge and boarding float system. The new float system will consist <br /> of HDPE-type boarding floats with hinged connections and a grated <br /> deck in the same footprint as the existing float and approach wedge <br /> system. Existing float guide piling will remain and be reused. <br /> (d) Asphalt Paving Repairs—perform design and prepare drawings and <br /> technical specifications for the repair and seal coat of the existing <br /> asphalt pavement. The areas for repair will be based on the areas <br /> identified in the RCO grant application documents and any minor <br /> refinements based on the visual site observation. <br /> (e) Restriping Plan-Prepare a restriping plan for the entire parking area <br /> to repaint the existing parking markings. It is assumed that only <br /> minor refinements will be required to the existing striping plan and <br /> that no major reconfiguration of the existing striping plan will be <br /> required. <br /> (f) Prepare an Opinion of Probable Construction Costs for the project <br /> elements. <br /> (g) 60%Review Documents—Prepare and provide documents at <br /> approximately the 60% level of completion for review by the City. <br /> The review documents will include the following: <br /> (1) Drawings in PDF format. The drawings will be prepared in <br /> AutoCAD in City format. <br /> (2) Technical Specifications in CSI format in a PDF file. <br /> (3) An Opinion of Probable Construction Costs in PDF format. <br /> Reid iddleto <br />