Laserfiche WebLink
Mr.Dean Shaughnessy <br /> City of Everett Parks and Community Service <br /> October 23,2019 <br /> File No.2042019.913.036 <br /> 4 <br /> Track the progress of the request for coverage under the Nationwide <br /> Permit for Repairs with the Corps of Engineers and answer technical <br /> questions. <br /> (b) Washington Department of Fish and Wildlife (WDFW)Hydraulic <br /> Project Approval (HPA)permit—fill out the online application for <br /> the HPA including attachment of the 8 1/2" x 11" drawings for all <br /> work waterward of Ordinary High Water. <br /> Track the progress of the HPA Permit with WDFW and answer <br /> technical questions. Note the HPA cannot be issued until the SEPA <br /> process is completed. <br /> (c) City of Everett SEPA Process—prepare a SEPA exemption request <br /> letter for the project. <br /> Track the progress of the SEPA exemption request and answer <br /> technical questions from the City. This scope excludes a full SEPA <br /> process. <br /> (d) City of Everett Shoreline Substantial Development Permit Process— <br /> prepare a Shoreline Substantial Development Permit application for <br /> the project including the JARPA, site plan, and Environmental <br /> Checklist. <br /> Attend a pre-application meeting if required. <br /> Track the progress of the Shoreline Substantial Development Permit <br /> and answer technical questions from the City via telephone and <br /> email. This scope excludes any revisions of permit application <br /> materials. <br /> (e) This scope excludes any public involvement,coordination with <br /> Native Tribes, and coordination with other stakeholders, other than <br /> the agencies listed above. <br /> 3. Washington Department of Natural Resources (DNR) Lease Exhibit <br /> (a) DNR discussions and Lease Exhibit-The City shall perform all <br /> negotiation and discussions with DNR regarding the project and a <br /> lease for the portion of the boat ramp facility on DNR land. <br /> Reid iddleto <br />