My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sazan Group Inc 12/18/2019 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2021
>
Sazan Group Inc 12/18/2019 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/24/2019 11:10:22 AM
Creation date
12/24/2019 11:09:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sazan Group Inc
Approval Date
12/18/2019
Council Approval Date
12/11/2019
End Date
12/31/2021
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Design
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$1,150,816.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Grant Award Federal Emergency Management Agency (2)
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Grant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br /> November 18, 2019 <br /> City of Everett, Public Works—Water Treatment Plant, Emergency Generator Replacement <br /> Contract Amendment—Professional Architectural and Engineering Services <br /> E. Mechanical Engineering: <br /> 1. Heating,ventilating, and exhaust system design, in compliance with minimum <br /> requirements of IBC, IMC, UPC,WAC, State of Washington Energy Code. <br /> 2. Plumbing: Plumbing design, cold water, building drainage systems, and roof <br /> drainage system. <br /> 3. Fire Suppression System; performance specifications. <br /> 4. Generator set fuel storage, piping,fuel polishing and pumping system,with leak <br /> detection. <br /> 5. Generator set cooling and exhaust. <br /> 6. Construction cost estimating assistance. <br /> F. Electrical Engineering: <br /> 1. Generator Plant: A complete electrical energy facility will be designed with <br /> generators and switchgear to meet the following objectives. The generators will <br /> be sized to support current site demand loads with N+1 redundancy plus addition <br /> of a future generator, and capable of independent operation in the event utility <br /> power is unavailable for extended periods. The main switchgear will provide <br /> utility connection, paralleling control of installed and future permanent <br /> generators, distribution to existing site transformers, and outdoor switchboards <br /> for connecting temporary generators at transformer secondaries. The switchgear <br /> design will be modular and maintainable without site shutdown or exposure to <br /> excessive arc flash risk. The existing 480volt generators and their paralleling <br /> equipment will be removed after the new generator plant is in service. The <br /> existing utility recloser replaced and connection to Portal 2 modified as <br /> coordinated with the serving utility. <br /> Site Distribution: A new underground site distribution system will be designed to <br /> provide power to the existing transformers. The distribution system will be <br /> designed for maintainability with limited impact to site operations. <br /> 2. Included in the work is an upgrade to following Motor Control Centers; <br /> MCC HFB/HFBG, replace both MCCs with single panelboard with discrete <br /> starters as required. <br /> MCC HFWPS/HFWPSG, replace both MCCs with single MCC or <br /> panelboard. Finish Water Pump#3 (250hp) starter will be replaced with VFD. <br /> MCC HW/HWGA, replace both MCCs with single unit. Two soft start and two <br /> line starters will be provided. Existing plug-based pump selection cabinet will be <br /> removed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.