Laserfiche WebLink
Page 4 <br /> November 18,2019 <br /> City of Everett,Public Works—Water Treatment Plant,Emergency Generator Replacement <br /> Contract Amendment—Professional Architectural and Engineering Services <br /> 3. Lighting: Building Interior and exterior lighting design. The lighting design will be <br /> based upon requirements recommended by the Illuminating Engineering Society <br /> of North America and Energy Code guidelines. <br /> 4. Signal, Communications, Control and Monitoring: Design for communications, <br /> control and monitoring systems, including; cable, pathways/raceways, cabinets. <br /> Systems interface with existing control and monitoring systems. <br /> 5. Fire Alarm: Performance specification and design coordination of an <br /> addressable Fire Alarm system, including coordination of space requirements. <br /> 6. Construction cost estimating assistance. <br /> G. Commissioning: <br /> 1. Review the design documents, provide report. <br /> 2. Provide commissioning specifications. <br /> 3. Review contractor submittals. <br /> 4. Develop commissioning plan. <br /> 5. Develop functional test tracking, scripts, and success criteria. <br /> 6. Conduct commissioning meetings as necessary. <br /> 7. Verify installation of mechanical and electrical systems. <br /> 8. Witness selected equipment startups. <br /> 9. Lead and verify functional performance testing of mechanical and electrical <br /> systems. <br /> 10. Collect data and support asset management system population. <br /> 11. Develop and provide commissioning report. <br /> 12. Review operations and maintenance manuals; provide report. <br /> 13. Provide and support maintenance protocols for all new equipment including genset <br /> equipment, batteries, alternators,fueling systems, etc. <br /> 14. Verify completion of Owner training. <br /> H. Design phases and documentation consisting of: <br /> 1. Project Restart: <br />