My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sazan Group Inc 12/18/2019 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2021
>
Sazan Group Inc 12/18/2019 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/24/2019 11:10:22 AM
Creation date
12/24/2019 11:09:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sazan Group Inc
Approval Date
12/18/2019
Council Approval Date
12/11/2019
End Date
12/31/2021
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Design
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$1,150,816.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Grant Award Federal Emergency Management Agency (2)
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Grant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 <br /> November 18,2019 <br /> City of Everett,Public Works—Water Treatment Plant, Emergency Generator Replacement <br /> Contract Amendment—Professional Architectural and Engineering Services <br /> a. Design kickoff meeting. <br /> b. Develop procurement specifications for long lead equipment. <br /> c. Field investigations and record document discovery. <br /> d. Code review. <br /> e. Calculations and utility company coordination. <br /> f. Development design schedule. <br /> 2. 60% and 90%Construction Documents: <br /> a. Adjustment of"Basis of Design"from 30% design phase. Incorporation of <br /> review comments in each of the submittals. <br /> b. Coordination of systems space requirements, development of building site and <br /> site electrical distribution, architectural design, electrical equipment layout and <br /> specifications,mechanical equipment coordination,fuel system development, <br /> diagrams and details. <br /> c. Electrical fault circuit analysis/coordination study. <br /> d. Construction specifications based upon using our master specifications in <br /> conventional CSI format. <br /> e. Coordination/review sets will be distributed to Owner and Consultants during <br /> progress of design. <br /> f. Construction cost estimate for each submittal. <br /> 3. 100% Construction, Final, Permit and Bid Documents: <br /> a. Owner review comment response. <br /> b. Complete architectural and structural plans, civil plans and details, mechanical and <br /> electrical systems plans and details. <br /> c. Construction specifications based upon using our master specifications in <br /> conventional CSI format. <br /> d. Preparation of permit and bid packages. <br /> 4. Bidding and Construction Phases: <br /> a. Submit permit and bid documents. <br /> b. Preparation of addenda to be reproduced and distributed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.