Laserfiche WebLink
Page 5 <br /> November 18,2019 <br /> City of Everett,Public Works—Water Treatment Plant, Emergency Generator Replacement <br /> Contract Amendment—Professional Architectural and Engineering Services <br /> a. Design kickoff meeting. <br /> b. Develop procurement specifications for long lead equipment. <br /> c. Field investigations and record document discovery. <br /> d. Code review. <br /> e. Calculations and utility company coordination. <br /> f. Development design schedule. <br /> 2. 60% and 90%Construction Documents: <br /> a. Adjustment of"Basis of Design"from 30% design phase. Incorporation of <br /> review comments in each of the submittals. <br /> b. Coordination of systems space requirements, development of building site and <br /> site electrical distribution, architectural design, electrical equipment layout and <br /> specifications,mechanical equipment coordination,fuel system development, <br /> diagrams and details. <br /> c. Electrical fault circuit analysis/coordination study. <br /> d. Construction specifications based upon using our master specifications in <br /> conventional CSI format. <br /> e. Coordination/review sets will be distributed to Owner and Consultants during <br /> progress of design. <br /> f. Construction cost estimate for each submittal. <br /> 3. 100% Construction, Final, Permit and Bid Documents: <br /> a. Owner review comment response. <br /> b. Complete architectural and structural plans, civil plans and details, mechanical and <br /> electrical systems plans and details. <br /> c. Construction specifications based upon using our master specifications in <br /> conventional CSI format. <br /> d. Preparation of permit and bid packages. <br /> 4. Bidding and Construction Phases: <br /> a. Submit permit and bid documents. <br /> b. Preparation of addenda to be reproduced and distributed. <br />