My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/12/24 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/12/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 11:51:30 AM
Creation date
1/2/2020 11:49:19 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/24/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> • Prepare a "Basis of Design" memorandum that sets forththe applicable design <br /> criteria, grant requirements, project objectives, permit requirements, known site <br /> conditions and the deliverables to complete the project. <br /> • Prepare a pre-design report that incorporates the design assumptions and site <br /> conditions set forth in the Basis of Design Memo. <br /> Deliverables: The following deliverables will be prepared: <br /> • Technical Basis of Design Memorandum <br /> • Pre-Design Report <br /> Assumptions: The following assumptions apply to this task: <br /> • City will provide review comments in a timely manner. <br /> • City will submit pre-design report to the Department of Ecology. <br /> Task 6 30% Design <br /> Objective: To prepare a 30%design package. <br /> Activities: The following activities are associated with this task: <br /> • Prepare 30%plans based on the Basis of Design Memo and input from the City and <br /> Department of Ecology. <br /> Deliverables: The following deliverables will be prepared: <br /> • 30%Plans <br /> • 30%Cost Estimate <br /> • Outline Specifications <br /> • <br /> Assumptions: The following assumptions apply to this task: <br /> • City will provide standard details and general conditions. <br /> • Parametrix will provide special provisions applicable to the project. <br /> • Most recent APWA/WSDOT specifications will be used. <br /> Task 7 90% Design <br /> Objective: To prepare a 90%design package for review by City and submittal to Ecology. <br /> Activities: The following activities are associated with this task: <br /> • Prepare 90%plans,specifications and cost estimate. <br /> • Conduct an independent Constructability Review. <br /> Ciry of Everett <br /> - 236-1844-821 <br /> Stormwater <br /> Quality Retrofets Evergreen Way 3 December 7,2013 <br /> 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.