My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Contractor shall not sublet to a single Subcontractor more than one-half of the Project. <br /> The City may refuse to approve any subcontract for any reason. Subcontractors will be <br /> considered agents of the Contractor and their work shall be subject to the provisions of <br /> the Contract. References in the Contract Documents to actions required of <br /> Subcontractors, manufacturers, suppliers, or any person other than the Contractor, the <br /> City or the City's Representative shall be interpreted as requiring that the Contractor <br /> shall require such Subcontractor, manufacturer, supplier or person to perform the <br /> specified action. <br /> 1-08.3 Progress Schedule <br /> 1-08.3(1) General Requirements <br /> Delete 1-08.3(1) and substitute the following: <br /> 1-08.3(1) General <br /> Because time is of the essence, diligent and expeditious progress and completion of the <br /> Work by the Contract Completion Date is required of the Contractor. Careful, adequate, <br /> accurate and complete planning and scheduling of the Work by the Contractor, both prior <br /> to the start of, and throughout, construction, is vital to the success of this Project for both <br /> the Contractor and the City. The purposes of the schedules and reports include: <br /> 1. Ensuring adequate planning and execution of the Work by the Contractor. <br /> 2. Assisting the City or its representative in monitoring construction. <br /> 3. Assessing the impact of any actual, potential or proposed change, including, <br /> but not limited to, the financial impact resulting from schedule changes and <br /> changes to the scope of Work. <br /> 1 4. Supporting the basis for construction payments. <br /> 5. Planning by City and tenants. <br /> 6. Avoiding additional or extra costs or expenses to the City. <br /> All schedules will be reviewed by the City and the City's Representative. The City or <br /> City's Representative's review of any schedule shall not transfer the Contractor's <br /> responsibilities to the City. Review shall not constitute approval or acceptance of the <br /> Contractors construction means, methods, sequencing, logic, order, precedence and <br /> succession of activities or Contractor's ability to complete the Work in a timely manner. <br /> Any mistakes or errors in any schedule, including, but not limited to, mistakes or errors <br /> of logic, order, precedence, and duration, are and remain the Contractors. The City or <br /> City's Representative may, however, comment upon the schedule. The Contractor <br /> remains wholly responsible for completing the Work within the Contract duration. Any <br /> comments by City or City's Representative personnel regarding the schedule shall not <br /> be construed as approval or ratification, nor shall the Contractor incorporate or change <br /> its schedule as a result of City or City's Representative comments in the absence of an <br /> express written directive to that effect. <br /> Contractor shall submit, update and maintain schedules as required by the Contract <br /> Documents. <br /> The Contractor shall provide sufficient material, equipment, and labor to meet the interim <br /> milestones, Substantial Completion, Physical Completion and Completion Dates <br /> provided by the Contract Documents. The City allocates its resources to a Contract <br /> based on the total time allowed in the Contract. The Contractor may submit a schedule <br /> indicating Completion Date earlier than the end of Contract Time, but City cannot <br /> guarantee its resources will be available to meet such schedule. City shall not pay or be <br /> I <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.