CITY OF EVERETT SPECIAL PROVISIONS <br /> liable for any additional compensation if the Contractor is not able to meet a schedule I <br /> that indicates a Completion Date earlier than the end of Contract Time. <br /> Failure to schedule City furnished or installed materials and Equipment for installation <br /> on or after its planned arrival pursuant to the City's Contract with the supplier or failure <br /> to notify the City in writing of tasks dependent upon the fact or date of arrival of such <br /> City furnished materials and Equipment, constitute a waiver by Contractor of any <br /> Contract Claim arising out of or related to the timeliness of the furnishing or installation <br /> of such material and Equipment. All schedules shall allow for timely incorporation of any <br /> others work under separate contract with City and for timely incorporation of any work <br /> provided and installed by City. Unless otherwise expressly authorized in writing by the <br /> City's Representative, the Contractor shall integrate the schedules with the Schedule of <br /> Values and unit price items so that each construction activity is represented by a dollar <br /> value. <br /> Float in a progress schedule belongs to the City. <br /> Subcontractors shall review all schedules prior to submission to the City and City's <br /> Representative. At the City's option and sole discretion, City may require Contractor to <br /> obtain written acceptance of each schedule by Subcontractors as practical and feasible, <br /> as the schedule relates to Subcontractors' work. <br /> Contractor shall not schedule any activity with an unrealistic, unduly long, or unduly short I <br /> duration. Contractor shall use its best efforts in good faith to set reasonable durations <br /> for all activities. Contractor shall not attempt to "grab the Float" or make an effort to use <br /> Float in the Progress Schedule for the benefit of the Contractor, rather than the benefit <br /> of the Project. Contractor shall use its best efforts in good faith to minimize <br /> dependencies, minimize the number of critical paths, and schedule the Project to be <br /> complete as expeditiously as reasonably possible. <br /> Contractor shall submit with each application for payment or progress pay estimate an <br /> updated progress schedule, but no less often than monthly. If requested by the City's <br /> Representative or the City, Contractor shall prepare and submit updated progress <br /> schedules from time to time that may be more frequent than monthly. <br /> The Contractor hereby expressly agrees and acknowledges that any failure by <br /> Contractor to provide accurate, complete, current and updated schedules at least <br /> monthly constitutes a waiver of any and all claims or requests for adjustment of Contract <br /> Sum or Time that arise out of, result from, or are caused by, any Delay on the Project or <br /> scheduling of the Work. Timely submission of updated schedules at least monthly is a <br /> condition precedent to any later or subsequent Contract Claim or request for an <br /> adjustment of either Contract Sum or Time related to or arising out of time, an alleged <br /> Delay, or the schedule or sequence of Work. Similarly, the parties agree the City may <br /> withhold progress pay estimates if updated schedules are not timely submitted monthly. <br /> These remedies are cumulative and not exclusive of other remedy. The City's use of <br /> one or more of these remedies does not constitute an election or prevent the City from <br /> pursuing other remedies for this or other defaults. <br /> No later than the pre-construction conference, Contractor shall submit a preliminary <br /> schedule ("Preliminary Schedule") for the entire Work to City's Representative and City. <br /> Contractor shall prepare such schedule in consultation with its Subcontractors. <br /> 1-08.3(2) Project Schedule Types <br /> Delete 1-08.3(2), including its subsections, and substitute the following: <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—94 <br /> I <br />