My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS , <br /> 7-09.3(9) Bedding the Pipe 1 <br /> Revise the first paragraph in 7-09.3(9) to read as follows: <br /> Place sand backfill for pipe zone bedding to the depths shown in COE Standard <br /> Drawing No. 615. Compact sand backfill for pipe zone bedding around the pipe to <br /> 90-percent of maximum density by approved hand-held tools, so as to provide firm <br /> and uniform support for the full length of the pipe, valves, and fittings. Determine <br /> maximum in place density using nuclear method (ASTM 2922-17). Determine <br /> laboratory maximum dry density and optimum moisture content using the Modified <br /> Proctor Method in accordance with ASTM D-1557. Take care to prevent damage to <br /> the pipe and its protective coating. <br /> 7-09.3(10) Backfilling Trenches <br /> Revise the last paragraph in 7-09.3(10) to read as follows: <br /> Place a minimum 12-inch sand cushion between the watermain and existing <br /> pipelines or other conduits when encountered during construction. <br /> Supplement 7-09.3(10) by adding the following: <br /> Backfill trenches in accordance with COE Standard Drawings No. 614, 615 and 620. <br /> The Engineer may authorize the use of Gravel Borrow or suitable native material in <br /> non-paved areas. <br /> 7-09.3(13) Handling of Pipe <br /> Supplement 7-09.3(13) by adding the following: <br /> Supply watermain pipe having ends plugged by manufacturer immediately after I <br /> manufacturing to eliminate debris entrance into the pipe during shipping and <br /> storage. Leave plugs in place until installing pipe in trench. Failure to supply the <br /> debris plugs or to maintain the debris plugs until pipe installation may be cause for111 <br /> City to reject the pipe or require Contractor to disinfect the pipe in accordance with <br /> AWWA C651 and as witnessed by City Water Quality personnel prior to installation. <br /> 7-09.3(19) Connections , <br /> 7-09.3(19)A Connections to Existing Mains <br /> Delete the last paragraph in 7-09.3(19)A and substitute the following: <br /> Only City Utilities Department personnel may make connections to existing <br /> watermains after successful pressure testing, disinfection and flushing. <br /> Schedule arrangements with the City Utilities Department a minimum of five <br /> business days in advance of making connections to the existing watermain. <br /> Assemble necessary materials, equipment, and labor necessary to properly <br /> complete the Work, in conjunction with COE forces, prior to beginning the <br /> connection. <br /> Provide traffic control and expose the watermain at the connection allowing <br /> sufficient room for COE forces to make connection, expose the watermain at <br /> the connection, including properly shoring and sheeting the excavation in <br /> accordance with requirements of WISHA, RCW 49.17 including WAC 296-155. <br /> Should City personnel determine the excavation and shoring and sheeting do <br /> not meet the requirements of WISHA, RCW 49.17, including WAC 296-155, <br /> City personnel will notify Contractor to make necessary modifications to bring <br /> the excavation and shoring into compliance prior to City personnel entering the <br /> trench. I <br /> Repair damage to existing pipe caused by the Contractor's operations at <br /> Contractor's expense. <br /> Watermain Replacement"U" Division 7—STORM, SEWER,WATER October 1, 2019 <br /> WO No.—UP3698 SP—177 <br />
The URL can be used to link to this page
Your browser does not support the video tag.