CITY OF EVERETT SPECIAL PROVISIONS I <br /> Once the conditions are deemed safe for City personnel to enter the trench, City will <br /> install the tapping sleeve and valve assembly and Utility Department personnel will <br /> perform the hot tapping of the existing main. . Upon City Utility Department personnel <br /> completing installing and testing the tapping sleeve and valve assembly. City Utility <br /> Department personnel will connect to Contractor's installed pipe upon Contractor's <br /> successful completion and testing of Contractor installed watermain. Backfill, compact, <br /> and restore the area. <br /> Where shown on the Plans, adjust existing valve boxes and covers to the grade as <br /> staked or otherwise designated by the Engineer. Using riser rings to adjust the valve <br /> box to grade is not allowed. <br /> Conduct removal operations conducted to prevent damage to the valve boxes. Replace <br /> parts or materials damaged due to the Contractors operations at his expense. <br /> Conduct valve box adjustments so the final adjusted valve box allows full operation of <br /> the valve. Remove debris from the adjusted valve boxes to ensure full valve operation. <br /> Delete the third sentence of the first paragraph in 7-12.3(1) and substitute the following: <br /> Where shown on the Plans, provide valve marker post with the exposed portion having ' <br /> the letter "V" and the distance in feet to the valve stenciled in black paint on the post. <br /> Provide a two inch high stencil to produce the letters and numerals. <br /> 7-12.4 Measurement , <br /> Delete all paragraphs of 7-12.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section <br /> 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-12.5 Payment <br /> Delete all paragraphs of 7-12.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-14 HYDRANTS <br /> 7-14.1 Description <br /> Supplement 7-14.1 as follows: <br /> 7-14.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-14.2 Materials , <br /> Delete the material list in 7-14.2 and substitute the following: <br /> Provide materials meeting the requirements of the following: <br /> Hydrants 9-30.5 Special Provisions <br /> 7-14.3 Construction Requirements <br /> 7-14.3(1) Setting Hydrants , <br /> Delete the first and second paragraphs in 7-14.3(1) and substitute the following: <br /> Provide fire hydrant assemblies in accordance with City of Everett Standard <br /> Drawing No. 507 and 508. 111 <br /> Revise the first sentence of the fourth paragraph to read as follows: <br /> Paint hydrants in accordance with Part L in COE Standard Drawing No. 507. <br /> Supplement 7-14.3(1) as follows: <br /> Watermain Replacement"U" Division 7—STORM, SEWER,WATER October 1, 2019 <br /> WO No.—UP3698 SP—183 <br />