Laserfiche WebLink
rCITY OF EVERETT SPECIAL PROVISIONS <br /> ' Consider a hydrant in service when it is installed in working order in accordance <br /> with the Plans and Specifications. <br /> ' 7-14.3(2) Hydrant Connections <br /> Delete the first paragraph in 7-14.3(2) and substitute the following: <br /> Provide continuous 6-inch diameter ductile iron pipe from the auxiliary gate valve at <br /> ' the main to the hydrant in accordance with COE Standard Drawing 507. <br /> Provide mechanical joint restraining glands conforming to 9-30.2(6) of these Special <br /> Provisions. <br /> 7-14.3(2)A Hydrant Restraints <br /> Revise the first paragraph in 7-14.3(2)A to read as follows: <br /> Restrain thrust created in short hydrant laterals of one pipe length or less using <br /> mechanical retainer glands at the auxiliary valve and hydrant fittings as shown <br /> in the COE Standard Drawing No. 507. For longer hydrant leads requiring two <br /> or more pipe lengths, Contractor may use field lock gaskets in lieu of <br /> mechanical joint restraint system to restrain the number of pipe joints between <br /> the auxiliary valve and the hydrant. <br /> 7-14.3(2)B Auxiliary Gate Valves and Valve Boxes <br /> ' Revise the first paragraph in 7-14.3(2)B to read as follows: <br /> Provide auxiliary gate valves and valve boxes in accordance with Section 7-12 <br /> and COE Standard Drawing No. 507. <br /> 7-14.3(4) Moving Existing Hydrants <br /> Revise the first paragraph to read as follows: <br /> ' Carefully salvage existing hydrant and install at new location shown on the Plans. <br /> Allow City Inspector to check over the hydrant for any damage that might have <br /> occurred during salvage operations. City Inspector will determine if extent of the <br /> ' damage, if any, can be repaired or if Contractor will need to replace hydrant in-kind. <br /> 7-14-3(6) Hydrant Extensions <br /> Supplement this section by adding the following: <br /> Attach hydrant extension immediately below the breaker ring. <br /> 7-14.4 Measurement <br /> Delete all paragraphs of 7-14.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions of these Special Provisions and Section <br /> ' 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-14.5 Payment <br /> Delete all paragraphs of 7-14.5 and substitute the following: <br /> ' Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-15 SERVICE CONNECTIONS <br /> 7-15.1 Description <br /> ' Delete the first paragraph of 7-15.1 and substitute the following: <br /> This Work consists of installing residential and commercial service connections from the <br /> main to the private line for the premises served. Include the meter box and meter setter <br /> for existing non-metered services. Include replacing existing meter boxes and meter <br /> setters as noted on the Plans and as directed by the Engineer. <br /> Watermain Replacement"U" Division 7-STORM, SEWER, WATER October 1, 2019 <br /> WO No.-UP3698 SP-184 <br />