Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Include cost of sprinkling during dry periods prior to placement of the topsoil and while <br /> spreading and compacting the material along with turf establishment in the unit price for this <br /> bid item. <br /> Payment for Topsoil, Type A& Seeding will be determined by the square yard as measured <br /> in place. <br /> Bid Item 36 - Monument Cases <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit price per each for monument case shall be full compensation for furnishing and <br /> placing the survey monument and monument case and cover, in accordance with the COE <br /> Standard Drawings, Standard Specifications and these Special Provisions, in conformity with <br /> the lines and locations shown on the Plans. <br /> Bid Item 37 - Saw-Cutting Asphalt Concrete Pavement, Final Joint Cut, Up To 6-Inch <br /> Thickness <br /> ' Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the final saw-cutting of asphalt concrete pavement, up to 6- <br /> inch thickness, shall be full compensation for all labor, material, tools, and equipment <br /> necessary to satisfactorily complete the Work as specified in Section 2-02.3(3) of the <br /> Standard Specifications, these Special Provisions and as shown on the Plans. The unit price <br /> per lineal foot for the final saw-cutting of asphalt concrete pavement, up to 6-inch thickness <br /> includes, but is not limited to, the saw-cutting necessary for the final joint between existing <br /> pavement and permanent HMA pavement. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> item as there will be no separate payment for cleanup. <br /> Bid Item 38 - Saw-Cutting Asphalt Concrete Pavement, Final Joint Cut, Additional 1- <br /> Inch Thickness <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the final saw-cutting of asphalt concrete pavement, for each <br /> full 1-inch depth beyond the initial 6-inch thickness, shall be full compensation for all labor, <br /> material, tools, and equipment necessary to satisfactorily complete the Work as specified in <br /> Section 2-02.3(3) of the Standard Specifications, these Special Provisions and as shown on <br /> the Plans. The unit price per lineal foot for the final saw-cutting of concrete pavement, up to <br /> 6-inch thickness includes, but is not limited to, the saw-cutting necessary for the final joint <br /> between existing pavement and permanent HMA pavement. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> item as there will be no separate payment for cleanup. <br /> Bid Item 39 - Saw-Cutting Concrete Pavement, Final Joint Cut, Up To 6-Inch <br /> Thickness <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the final saw-cutting of concrete pavement, up to 6-inch <br /> thickness, shall be full compensation for all labor, material, tools, and equipment necessary <br /> to satisfactorily complete the Work as specified in Section 2-02.3(3) of the Standard <br /> ' Specifications, these Special Provisions and as shown on the Plans. The unit price per lineal <br /> Watermain Replacement"U" Division B—BID DESCRIPTIONS October 1, 2019 <br /> ' WO No.—UP3698 SP-11 <br />