My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Include cost of sprinkling during dry periods prior to placement of the topsoil and while <br /> spreading and compacting the material along with turf establishment in the unit price for this <br /> bid item. <br /> Payment for Topsoil, Type A& Seeding will be determined by the square yard as measured <br /> in place. <br /> Bid Item 36 - Monument Cases <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit price per each for monument case shall be full compensation for furnishing and <br /> placing the survey monument and monument case and cover, in accordance with the COE <br /> Standard Drawings, Standard Specifications and these Special Provisions, in conformity with <br /> the lines and locations shown on the Plans. <br /> Bid Item 37 - Saw-Cutting Asphalt Concrete Pavement, Final Joint Cut, Up To 6-Inch <br /> Thickness <br /> ' Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the final saw-cutting of asphalt concrete pavement, up to 6- <br /> inch thickness, shall be full compensation for all labor, material, tools, and equipment <br /> necessary to satisfactorily complete the Work as specified in Section 2-02.3(3) of the <br /> Standard Specifications, these Special Provisions and as shown on the Plans. The unit price <br /> per lineal foot for the final saw-cutting of asphalt concrete pavement, up to 6-inch thickness <br /> includes, but is not limited to, the saw-cutting necessary for the final joint between existing <br /> pavement and permanent HMA pavement. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> item as there will be no separate payment for cleanup. <br /> Bid Item 38 - Saw-Cutting Asphalt Concrete Pavement, Final Joint Cut, Additional 1- <br /> Inch Thickness <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the final saw-cutting of asphalt concrete pavement, for each <br /> full 1-inch depth beyond the initial 6-inch thickness, shall be full compensation for all labor, <br /> material, tools, and equipment necessary to satisfactorily complete the Work as specified in <br /> Section 2-02.3(3) of the Standard Specifications, these Special Provisions and as shown on <br /> the Plans. The unit price per lineal foot for the final saw-cutting of concrete pavement, up to <br /> 6-inch thickness includes, but is not limited to, the saw-cutting necessary for the final joint <br /> between existing pavement and permanent HMA pavement. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> item as there will be no separate payment for cleanup. <br /> Bid Item 39 - Saw-Cutting Concrete Pavement, Final Joint Cut, Up To 6-Inch <br /> Thickness <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the final saw-cutting of concrete pavement, up to 6-inch <br /> thickness, shall be full compensation for all labor, material, tools, and equipment necessary <br /> to satisfactorily complete the Work as specified in Section 2-02.3(3) of the Standard <br /> ' Specifications, these Special Provisions and as shown on the Plans. The unit price per lineal <br /> Watermain Replacement"U" Division B—BID DESCRIPTIONS October 1, 2019 <br /> ' WO No.—UP3698 SP-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.