My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:08:23 AM
Creation date
1/9/2020 11:06:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/22/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 >< <br /> GC/CM Contract <br /> General Contractor/Construction Manager Services for <br /> Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream) <br /> 1.1.4. Specifications: Included in this Contract as Attachment 8, the <br /> Specifications sections listed on page TOC-ii, "Table of Contents", <br /> dated December 2013. <br /> 1.1.5. Change Orders <br /> 1.1.6. That part of the GC/CM's Final Proposal Form that sets forth their <br /> prices for the Percent Fee Percentage and Fixed Amount for Specified <br /> General Conditions Work for Phase Cl work <br /> 1.1.7. Other documents listed in the Contract Documents <br /> 1.1.8. Scope of Work for Bid Package #100 - Concrete Piles, included in this <br /> Contract as Attachment 9, dated December 2013. (4 page document) <br /> 1.2. Engineer: Refers to Carollo Engineers, Inc., hired by the Owner to develop <br /> the Drawings and Specifications for the Project and assist the Owner in <br /> management of the GC/CM Contract. <br /> 1.3. Fixed Amount for Specified General Conditions: "Fixed Amount for Specified <br /> General Conditions" means the amount listed on page 1 of this GC/CM <br /> Contract. <br /> 1.4. General Contractor/Construction Manager: "General Contractor/Construction <br /> Manager" (GC/CM) means the entity identified above as party to this Contract <br /> responsible for completion of the Project. The Owner and GC/CM previously <br /> executed a separate Preconstruction Services Contract in which the GC/CM <br /> provided services during the design phase of the Project. <br /> 1.5. Maximum Allowable Construction Cost: The "Maximum Allowable <br /> Construction Cost" (MACC) means the maximum cost the Owner will pay the <br /> GC/CM to complete the Work and construct the Project, as specified on Page <br /> 1 of this GC/CM Contract. The MACC includes Total for Subcontract Costs, <br /> Negotiated Support Services and a Risk Contingency Account, but does not <br /> include the Percent Fee Amount, Fixed Amount for Specified General <br /> Conditions, sales tax, or Preconstruction Services. The MACC shall be <br /> organized by the items, categories and costs set forth in Attachment 2, <br /> "Phase Cl Total Contract Cost Summary". <br /> 1.6. Negotiated Support Services: "Negotiated Support Services" (NSS) means <br /> items the GC/CM would normally manage or perform on a construction <br /> project. The specific Negotiated Support Services are identified in the <br /> City of Everett Page 3 of 25 December, 2013 <br /> Water Pollution Control Facility Expansion <br /> 1 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.