My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:08:23 AM
Creation date
1/9/2020 11:06:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/22/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> GC/CM Contract <br /> General Contractor/Construction Manager Services for <br /> -; Tr Water Pollution Control Facility Expansion <br /> ansion <br /> Phase Cl (Liquid Stream) <br /> Documents. The Total Contract Cost consists of the Fixed Amount for the <br /> Specified General Conditions work, the Maximum Allowable Construction <br /> Cost and the Percent Fee Amount. The TCC shall be organized by the items, <br /> categories and costs set forth in Attachment 2, "Phase Cl Total Contract Cost <br /> Summary". <br /> 1.16. Total for Subcontract Costs: "Total for Subcontract Costs" means all costs <br /> incurred for performance and completion of the Work, provided that the <br /> following are specifically excluded: Fixed Amount for Specified General <br /> Conditions, Negotiated Support Services, Percent Fee, Risk Contingency <br /> Account, Washington State sales tax, and the costs excluded in Section 6.1.2 <br /> of this Contract. <br /> ARTICLE 2 -THE CONTRACT DOCUMENTS <br /> 2.1. Contract Documents: The Contract Documents, as defined in Article 1, of this <br /> Contract, form the complete agreement between the Parties, and are as fully <br /> a part of the Contract as if attached to this Contract or repeated herein. The <br /> Contract Documents represent the entire and integrated agreement between <br /> the Parties related to this Project and supersede prior negotiations, <br /> representation or agreements, either written or oral, except for the separately <br /> negotiated Preconstruction Services Contract. . In the event of any <br /> inconsistencies between the component parts of the Contract Documents, the <br /> order of precedence of the documents shall be as stated in the General <br /> Conditions. <br /> ARTICLE 3 -WORK OF THIS CONTRACT <br /> 3.1. General. The GC/CM shall execute, perform, coordinate and manage the <br /> Work of the Contract Documents in as expeditious, collaborative, and <br /> professional a manner necessary to achieve all Project milestones and <br /> deadlines, inclusive of Substantial Completion and Final Acceptance, within <br /> the Total Contract Cost unless modified by Change Order. The GC/CM shall <br /> provide Construction Management (CM) services throughout the Project, from <br /> contract execution through construction and shall closely coordinate such <br /> work with the Owner and Engineer. The GC/CM shall provide CM services, <br /> City of Everett Page 5 of 25 December, 2013 <br /> Water Pollution Control Facility Expansion <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.