My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:08:23 AM
Creation date
1/9/2020 11:06:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/22/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 GC/CM Contract <br /> General Contractor/Construction Manager Services for <br /> E17ET1_ , T Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream) <br /> In the event the GC/CM proposes to substitute any of the key <br /> personnel designated below due to death or employment termination, <br /> the GC/CM shall use the backup personnel shown below. In the event <br /> that the backup personnel are not available, the individual(s) proposed <br /> must demonstrate the qualifications indicated in the Request for <br /> Proposals (RFP) for their respective role(s), and experience as <br /> required to successfully perform such duties. The Owner shall have <br /> the sole right to determine whether key personnel proposed as <br /> substitutes are qualified to work on the Project. The GC/CM will <br /> remove from the Project any personnel assigned to the Project if, after <br /> the matter has been thoroughly considered by the Owner and GC/CM, <br /> the Owner considers such removal necessary and in the best interest <br /> of the Project, and the Owner so notifies the GC/CM in writing and <br /> allows a reasonable period of time for the transition to different <br /> personnel. <br /> Full Time Equivalent (FTE) is based on a 40-hour work week, 52 <br /> weeks per year, for an equivalent 2,080 hours per year, for the <br /> duration of the Project from Notice to Proceed to Final Completion. <br /> Primary Personnel <br /> Minimum FTE <br /> Position Title Name of Individual Subcontract Construction <br /> Bidding <br /> Project Manager Todd Pike 1.0 1.0 <br /> Project Superintendent Kelly Brown 0.3 1.0 <br /> Project Engineer Paul Prozinski 0.1 1.0 <br /> Backup Personnel <br /> Position Title Name of Individual <br /> Project Manager Paul Prozinski <br /> Project Superintendent Greg Burress <br /> Project Engineer CJ Handforth <br /> 3.5. Permits: Refer to General Conditions Article 6.08 A. <br /> City of Everett Page 9 of 25 December, 2013 <br /> Water Pollution Control Facility Expansion <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.