My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:08:23 AM
Creation date
1/9/2020 11:06:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/22/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 r�\ <br /> GC/CM Contract <br /> �t s <br /> / ...*%/%l411311: <br /> General Contractor/Construction Manager Services for <br /> ''� EV��� Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream) <br /> preconstruction activities as part of the separately executed <br /> Preconstruction Services Contract between the Owner and GC/CM. <br /> The Owner, Engineer, GC/CM, and principal Subcontractors when <br /> known, shall participate in a second partnering session. Principal <br /> Subcontractors should include: electrical and mechanical, and others <br /> as the GC/CM and Owner jointly agree are appropriate. The purpose <br /> of the partnering workshop shall be: <br /> 4.2.2.1 To establish mutual understanding of partnering concepts; <br /> 4.2.2.2 To develop the mission statement and goals for the Project <br /> for all parties; <br /> 4.2.2.3 To develop a process so that critical issues can be quickly <br /> resolved. <br /> 4.2.3. The Owner shall be responsible for arranging for and providing the <br /> facilities, facilitator, and any materials for the workshop. The GC/CM <br /> shall pay one-third (%) of the costs for the facilitator and facilities not- <br /> to-exceed Two Thousand Dollars ($2,000.00), as a Specified General <br /> Conditions cost. The GC/CM shall ensure that key Projectpersonnel <br /> attend and participate in the workshop. The cost of attendance at the <br /> workshop by the GC/CM's key personnel shall be a Specified General <br /> Conditions cost. <br /> ARTICLE 5 - DATE OF COMMENCEMENT, TIME OF COMPLETION, LIQUIDATED <br /> DAMAGES <br /> 5.1. Time is of the Essence: It is understood that time is of the essence in <br /> performing the Work, and the GC/CM shall provide the necessary equipment, <br /> personnel and services to commence on the date this Contract is executed <br /> and achieve all progress and completion milestones within the time periods <br /> set forth herein. <br /> 5.2. Date of Commencement: The date of commencement for the Work included <br /> herein shall be by a Notice to Proceed to the GC/CM. Any Work performed <br /> prior to issuance of the Notice to Proceed shall be at the GC/CM's sole risk <br /> and expense. The Owner at its option may issue a limited or phased Notice <br /> to Proceed for a specified partial scope of Work. <br /> City of Everett Page 11 of 25 December, 2013 <br /> Water Pollution Control Facility Expansion 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.