Laserfiche WebLink
Ci <br /> Qualifications and Experience Criterion <br /> Engineering America Shearer&Assoc. T Bailey <br /> 9 out of 10% points 9 out of 10% points 9 out of 10% points <br /> o For the Business Proposal Criterion the fixed prices for each proposal as well as <br /> the results of Brown and Caldwell's Present Value Life Cycle Cost analysis, which <br /> included sensitivity analyses for a variety of operation and maintenance cost <br /> scenarios, were discussed and scored as follows: <br /> Business Proposal Criterion <br /> Engineering America Shearer&Assoc. T Bailey <br /> 0 out of 40% points 40 out of 40% points 31 out of 40% points <br /> • 0 points assigned • Shearer Tank's Fixed • T Bailey's Fixed DB price is <br /> because Fixed DB price DB price and PVLCC within the City's budget for <br /> is higher than the were the lowest. Fixed the project and over $0.5M <br /> City's budget and DB price was the lowest more than lowest proposal. <br /> because Fixed DB Price and under the City's PVLCC is about$0.4 to <br /> and PVLCC were over budget. $1.2M higher depending on <br /> 50 percent higher than o Fixed Design-Build assumed maintenance costs. <br /> that of the lowest Price:$4,500,828 o Fixed Design-Build Price: <br /> submitted price. o Present Value Life $5,012,275 <br /> o Fixed Design-Build Lyle Cost: $4.5M o Present Value Life Cycle <br /> Price: to$4.6M depending Cost: $5.0M to $5.7M <br /> $6,976,388 on O&M based on O&M <br /> o Present Value Life assumptions assumptions. Highest is <br /> Cycle Cost: $7.0M for sensitivity case with <br /> to$7,1M recoating in year 25. (1) <br /> depending on O&M <br /> assumptions <br /> (1) Brown and Caldwell reported that The National Association of Corrosion Engineers(NACE) <br /> International Paper No.08279, estimates service life for various coatings and gives typical potable <br /> water applications in the 19-27 year service life <br /> o Total Scoring by the Evaluation Committee was as follows: <br /> Engineering America Shearer&Assoc. T Bailey <br /> 47 out of 100% points 96 out of 100% points 78 out of 100% points <br /> 5) Negotiations <br /> Based on the results of the evaluation and scoring process, the Evaluation Committee <br /> recommended the City initiate negotiations with the highest scoring proposer -- Shearer & <br /> Associates. <br /> 6) Selection <br /> Negotiations began with Shearer&Associates on January 16, 2014 with an agreement reached <br /> on January 30, 2014. With that agreement the project Evaluation Committee recommends <br /> selecting Shearer &Associates as the successful proposer and requesting the City Council to <br /> award this Design-Build Contract to them. <br /> 26 <br />