My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/03/19 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/03/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 9:24:00 AM
Creation date
1/23/2020 9:17:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/19/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> I <br /> Amendment No. 1 to GC/CM Contract <br /> •' � General Contractor/Construction Manager Services for <br /> Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream) <br /> J. Section 6.3 of the Contract is amended to read as follows: <br /> 6.3. Negotiated Support Services. A complete and detailed cost breakdown, in <br /> a format acceptable to the Owner, for Negotiated Support Services is included in <br /> the Contract as Attachment 4, dated March 2014, replacing the original <br /> Attachment 4, dated December 2013. Negotiated Support Services shall be paid <br /> by the Owner in an amount not to exceed the Negotiated Support Services sum <br /> set forth in Table 1 of this GC/CM Contract. The GC/CM may submit <br /> Applications for Payment for Negotiated Support Services that vary from the <br /> detailed cost breakdown shown in Attachment 4, as long as such variances do <br /> not exceed the Negotiated Support Services sum set forth in Table 1 , less the <br /> Owner-controlled allowance described in 6.3.1. The GC/CM shall earn and be <br /> paid such NSS according to General Conditions 14.03. The costs for <br /> management required to administer the Negotiated Support Services Work shall <br /> be included in the Fixed Amount for Specified General Conditions. <br /> 6.3.1. The Negotiated Support Services sum set forth in Table 1 of this <br /> GC/CM Contract includes Bid Item 400 and Bid Item 500.01 which are <br /> Owner-controlled items that may be used for Negotiated Support Services <br /> detailed in Attachment 4. The GC/CM shall submit a written request to the <br /> Owner for use of these two (2) such Negotiated Support Services Bid <br /> Items and shall include a Rough Order of Magnitude (ROM) budget <br /> estimate for the cost of such work. The Owner will respond to the request <br /> with a written approval or denial. <br /> K. Section 6.6.1 of the Contract is amended to read as follows: <br /> 6.6.1 Accounting. Starting with the award of the first subcontract bid package, <br /> the GC/CM shall, in accordance with directions given and formats developed by <br /> the Owner, provide Owner with monthly reports, including but not limited to, <br /> showing expenditures on all subcontract bid packages, all Contract changes, all <br /> uses of Project Contingency (which shall be allocated through a Project <br /> Contingency Reallocation to the various and appropriate GC/CM cost <br /> categories), and all Negotiated Support Services costs including forecast-to-Final <br /> Completion updates. GC/CM claims shall be accounted for separately. <br /> City of Everett Page 5 of 10 March 3, 2014 <br /> Water Pollution Control Facility Expansion <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.