Laserfiche WebLink
I <br /> Amendment No. 1 to GC/CM Contract <br /> '' General Contractor/Construction Manager Services for <br /> Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream) <br /> L. Attachment 5 to the Contract, Subcontract Plan, dated January 6, 2014 is <br /> replaced in its entirety by the attached Attachment 5 dated March 3, 2014. <br /> M. Attachment 6 to the Contract, General Conditions, Section 1.01 A25 is amended <br /> as follows: <br /> a. Replace 1.01 A 25 with the following: <br /> 25. Order of Precedence - Any inconsistency in the parts of the Contract <br /> shall be resolved by following this order of precedence (e.g., 1 <br /> presiding over 2, 2 over 3, 3 over 4, and so forth): <br /> 1. Change Orders, issued after the execution of the GC/CM Contract <br /> 2. GC/CM Contract, with all attachments except Attachment 1, <br /> Attachment 5, Attachment 6, Attachment 7, Attachment 8, and <br /> Attachment 9 <br /> a. In the event of a conflict, the GC/CM Contract without <br /> attachments shall take precedence over Attachment 2 through <br /> Attachment 4 <br /> b. In the event of a conflict, Attachment 3 shall take precedence <br /> over Attachment 2 <br /> c. In the event of a conflict, Attachment 4 shall take precedence <br /> over Attachment 2 <br /> 3. Attachment 6 to GC/CM Contract, "General Conditions of the <br /> GC/CM Contract" <br /> 4. Attachment 8 to GC/CM Contract, "Specifications", with (a) taking <br /> priority over (b): <br /> a. Division 01 Specifications <br /> b. Technical Specifications <br /> 5. Attachment 7 to GC/CM Contract, "Drawings" (in case of conflict <br /> within the Drawings, large scale drawings shall take precedence <br /> over small scale drawings) <br /> 6. That part of the GC/CM's Final Proposal Form that sets forth their <br /> prices for the Percent Fee Percentage, Percent Fee Amount, and <br /> Fixed Amount for Specified General Conditions Work. <br /> 7. Other documents listed in the Contract Documents <br /> 8. Attachment 5 to GC/CM Contract, "Subcontract Plan" <br /> City of Everett Page 6 of 10 March 3, 2014 <br /> Water Pollution Control Facility Expansion <br /> 9 <br />