Laserfiche WebLink
i <br /> Amendment No. 1 to GC/CM Contract <br /> General Contractor/Construction Manager Services for <br /> Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream) <br /> 9. Attachment 1 to GC/CM Contract, "Summary Matrix of Cost <br /> Allocation" <br /> b. Insert the following as 1.01 A 31.5 <br /> Project Contingency Reallocation -A document which is signed by GC/CM <br /> and Owner and authorizes the reallocation of funds from the Project <br /> Contingency within the TCC. A Project Contingency Reallocation will not <br /> change the TCC or the Contract Time but is evidence that the parties <br /> agree to the reallocation within the TCC. A Project Contingency <br /> Reallocation shall be signed on behalf of Owner by the Owner's <br /> Representative. <br /> N. Attachment 6 to the Contract, General Conditions, Section 2.05 A 2 is amended <br /> to read as follows: <br /> 2. A Schedule of Values for all of the Work which when added together total the <br /> TCC. The line items in the schedule of values will have the same name and <br /> identification numbers as the activities in the Construction Progress Schedule <br /> and shall include separate lines for Specified General Conditions, Project <br /> Contingency, Percent Fee Amount, Negotiated Support Services, Risk <br /> Contingency Account, and the Total for Subcontract Costs. <br /> O. Attachment 6 to the Contract, General Conditions, Section 6.11 A is amended to <br /> read as follows: <br /> A. GC/CM shall maintain in a safe place at the Site one record copy of all <br /> Drawings, Specifications, Addenda, Change Orders, Work Change Directives, <br /> Project Contingency Reallocations, Field Orders, and written interpretations and <br /> clarifications in good order and annotated to show changes made during <br /> construction. These record documents together with all approved Samples and a <br /> counterpart of all approved Shop Drawings will be available to the Owner and <br /> Engineer for reference. Upon completion of the Work, these record documents, <br /> Samples, and Shop Drawings will be delivered to the Owner. <br /> P. Attachment 6 to the Contract, General Conditions, Section 8.13 D is amended to <br /> read as follows: <br /> City of Everett Page 7 of 10 March 3, 2014 <br /> Water Pollution Control Facility Expansion <br /> 10 <br />