Laserfiche WebLink
� A <br /> Amendment No. 1 to GC/CM Contract <br /> General Contractor/Construction Manager Services for <br /> Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream) <br /> GCICM Contract Section How Changed under Amendment No. 1 <br /> Attachment 3, "Detailed Breakdown of Attached to this Amendment No. 1 and <br /> Total for Subcontract Costs" replaces Attachment 3 to the Contract (See <br /> section I below) <br /> Attachment 4, "Detailed Breakdown of Attached to this Amendment No. 1 and <br /> Negotiated Support Services" replaces Attachment 4 to the Contract (See <br /> section J below) <br /> Attachment 5, "Subcontract Plan" Attached to this Amendment No. 1 and <br /> replaces Attachment 5 to the Contract (See <br /> section L below) <br /> Attachment 6, "General Conditions of Revised as set forth below in Sections M-V <br /> the GC/CM Contract" <br /> Attachment 7, "Drawings" Attached to this Amendment No. 1 and <br /> replaces Attachment 7 to the Contract (See <br /> section B below) <br /> Attachment 8, "Specifications" Attached to this Amendment No. 1 and <br /> replaces Attachment 8 to the Contract (See <br /> section C below) <br /> Attachment 9, "Scope of Work for Bid Deleted (See section D below) <br /> Package#100 - Concrete Piles" <br /> AGREEMENT <br /> The City and GC/CM agree to amend the Contract as follows: <br /> A. Table 1 of the Contract is amended to read as follows: <br /> Table 1: Total Contract Cost <br /> Phase Cl (Liquid Stream) <br /> Percent Fee Percentage of the MACC (3.8%) $975,243.98 <br /> Percent Fee Amount <br /> Fixed Amount for Specified General Conditions $1,515,000.00 <br /> Project Contingency $520,000.00 <br /> Maximum Allowable Construction Cost (MACC) $25,664,315.16 <br /> City of Everett Page 2 of 10 March 3, 2014 <br /> Water Pollution Control Facility Expansion <br /> 5 <br />