Laserfiche WebLink
p <br /> Amendment No. 1 to GC/CM Contract <br /> General Contractor/Construction Manager Services for <br /> EgfffiErr Water Pollution Control Facility Expansion <br /> Phase Cl (Liquid Stream) <br /> Total for Subcontract Costs: $21,930,825.91 <br /> Negotiated Support Services: $3,185,218.60 <br /> Risk Contingency Account: $548,270.65 <br /> Total Contract Cost (without sales tax): $28,704,559.13 <br /> B. Section 1.1.3 of the Contract is amended to read as follows, such that the <br /> attached Attachment 7 replaces the original Attachment 7 to the Contract: <br /> 1.1.3. Drawings: Included in this Contract as Attachment 7, the 337 drawing <br /> sheets that are listed on Drawing No. G-002, G-003 and G-004 "General Drawing <br /> Index", dated 02/25/2014. <br /> C. Section 1.1.4 of the Contract is amended to read as follows such that the <br /> attached Attachment 8 replaces the original Attachment 8: <br /> 1.1.4. Specifications: Included in this Contract as Attachment 8, the <br /> Specifications sections listed on pages TOC through TOC-vi, "Table of <br /> Contents", dated February 2014 <br /> D. Section 1.1.8 of the Contract related to the Scope of Work for Bid Package #100 <br /> Concrete Piles is deleted. Attachment 9 is deleted, as the work contained in <br /> Attachment 9 is contained in the Attachments 7 and 8 attached to Amendment <br /> No. 1. <br /> E. Section 1.5 of the Contract is amended to read as follows: <br /> 1.5 Maximum Allowable Construction Cost: The "Maximum Allowable <br /> Construction Cost" (MACC) means the maximum cost the Owner will pay the <br /> GC/CM to complete the Work and construct the Project, as specified on Page 1 <br /> of this GC/CM Contract. The MACC includes Total for Subcontract Costs, <br /> Negotiated Support Services and a Risk Contingency Account, but does not <br /> include the Percent Fee Amount, Fixed Amount for Specified General Conditions, <br /> Project Contingency, sales tax, or Preconstruction Services. The MACC shall be <br /> organized by the items, categories and costs set forth in Attachment 2, `Phase <br /> Cl Total Contract Cost Summary". <br /> City of Everett Page 3 of 10 March 3, 2014 <br /> Water Pollution Control Facility Expansion <br /> 6 <br />