Laserfiche WebLink
3. On Detail 7/S3.1, it appears that the intermediate 0.75"diameter STD Pipe vertical posts <br /> that comprise the guardrails exceed the 4"sphere threshold per IBC 1015.4. Please revise <br /> geometry as required. <br /> 4. On Detail 3/S3.1, it appears that the 4" max spacing would permit the passage of a 4" <br /> sphere per IBC 1011.5.5.3 Exception 1. Please revise as required. <br /> If you have any questions, please email or call me at (425) 257-7287. Upon submittal of the <br /> drawings, your application will be given priority and plan reviews will recommence. All required <br /> submittals shall be sufficient detail and contain sufficient information to ensure that the proposed <br /> structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> James Bronder,PE, SE <br /> Associate Engineer <br /> Plans Examiner <br /> iage2of2 <br /> CITY OF EVERETT •3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax (425) 257-88 <br />