My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 1/31/2020
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 1/31/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 11:04:20 AM
Creation date
2/4/2020 11:55:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
1/31/2020
Council Approval Date
1/22/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Tracking Number
0002205
Total Compensation
$1,803,078.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech 1/8/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC 8/11/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Edgewater Creek Bridge Replacement <br /> 2.3.4 Pipe invert elevations are a part of the scope of services. <br /> 2.4 Office Processing <br /> This task includes the office processing of the collected survey data, data extraction, field book <br /> note reductions, CADD drafting, and other duties required for the generation of the <br /> deliverable(s). <br /> For 3D laser scanning efforts, sub-tasks include the registering of point clouds; evaluating the <br /> registrations;exporting the point cloud data to Civil3D;creating or picking of appropriate points <br /> in Civil3D; Linework and Layering,and standard CADD drafting of the deliverables,as <br /> required. <br /> 2.5 Right-of-Way and Boundary Resolution(s) <br /> 2.5.1 Right-of-Way(ROW)—Resolve right-of-way within the project limits. <br /> 2.5.2 Parcel Resolution—Resolve boundaries for parcels 00433600006600, 00433600002100, <br /> 00433600006501 and 00433600006052. <br /> 2.5.3 Review ROW plans created by Perteet. <br /> Assumptions: <br /> 1. Rights-of-Entry will be provided by the City of Everett. <br /> 2. Traffic control, if required, will be a uniformed officer and billed as an invoiced ODC. <br /> 3. Measurement of tree driplines/canopies are not a part of the scope services. <br /> 4. Tree Tags are not a part of the scope of services. <br /> 5. Boundary and Right-of-Way resolution is not a part of the scope of services. <br /> 6. Setting of property corners is not a part of the scope of services. <br /> 7. A record of Survey is not a part of the scope of services. <br /> 8. Up to 60 Ordinary High-Water Mark flags, set by others,to be located. <br /> 9. 1 Alliance will try to schedule the conductible utility locating service to be onsite within <br /> 5 business days from the notice to proceed. <br /> 10. 1 Alliance will not be responsible for the completeness or timeliness of the conductible <br /> utility locating service. <br /> 11. Title reports with underlying documents for parcels 00433600006600, 00433600002100, <br /> 00433600006501 and 00433600006052 to be provided by the CITY. <br /> Deliverables: <br /> 1. Topographic Survey with 1-foot contour intervals(electronic copy). <br /> 2. AutoCAD Surfaces(DTM Files) (electronic copy). <br /> 3. Copy of field survey books (hard copy). <br /> 4. ASCII file of control points. <br /> Page 6 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.