My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 1/31/2020
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 1/31/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 11:04:20 AM
Creation date
2/4/2020 11:55:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
1/31/2020
Council Approval Date
1/22/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Tracking Number
0002205
Total Compensation
$1,803,078.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech 1/8/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC 8/11/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Edgewater Creek Bridge Replacement <br /> WORK ELEMENT 3 GEOTECHNICAL ENGINEERING: <br /> This Work Element is performed by HWA to provide geotechnical engineering investigations and <br /> report to support the design team. The geotechnical engineering effort will include the following <br /> activities: <br /> 3.1 Project Management <br /> 3.1.1 Attend Project Kickoff Meeting: CONSULTANT will attend one project kickoff <br /> meeting with the City of Everett and the design team. This meeting will review project <br /> objectives,communication protocol and schedule. CONSULTANT assumes that this <br /> meeting will take place at the City of Everett's Office. <br /> 3.1.2 Project Coordination Meetings: CONSULTANT will attend up to eight(8)project <br /> coordination meetings with the design team. CONSULTANT's attendance will be used <br /> to convey the geotechnical considerations of the site to the City of Everett and the design <br /> team. <br /> 3.1.3 Invoice Generation and Processing: CONSULTANT will prepare monthly invoices,and <br /> progress reports for the duration of the design phase of the project. <br /> 3.1.4 Geotechnical Task Management: CONSULTANT will provide geotechnical task <br /> management to all geotechnical related aspects of the project. CONSULTANT will <br /> correspond with the City and the design team in the form of emails, fax, and telephone <br /> calls, as necessary. <br /> 3.2 Review Existing Geotechnical and Foundation Information <br /> 3.2.1 Collect and Review Available Geotechnical Data: CONSULTANT will collect and <br /> review readily available and relevant geotechnical information within the project site. <br /> This review will include online geotechnical databases, geologic maps, and <br /> CONSULTANT library. <br /> 3.3 Field Geotechnical Explorations <br /> 3.3.1 Plan Field Exploration Program: CONSULTANT will plan and coordinate a 2-phased <br /> geotechnical exploration program for the project. Phase 1 will consist of conducting a <br /> series of geotechnical borings within the roadway in support of the bridge replacement. <br /> Phase 2 of our proposed field explorations will consist of conducting a reconnaissance of <br /> the ravine slopes and limited access borings along the slope adjacent to the bridge. <br /> Planning will include identification of the location of the geotechnical borings, <br /> development of traffic control plans, and coordination of required equipment and utility <br /> clearance. <br /> 3.3.2 Conduct Utility Locates for Geotechnical Explorations: Prior to generation <br /> of our geotechnical work plan, CONSULTANT will mark the proposed <br /> exploration locations and arrange for utility locates using the Utility <br /> Page 8 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.