My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 1/31/2020
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 1/31/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 11:04:20 AM
Creation date
2/4/2020 11:55:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
1/31/2020
Council Approval Date
1/22/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Tracking Number
0002205
Total Compensation
$1,803,078.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech 1/8/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC 8/11/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Edgewater Creek Bridge Replacement <br /> this task. Information gathered under this task will be placed in CONSULTANT files and used <br /> in the work items related to document production subtasks. <br /> 4.2 NEPA/SEPA Documentation <br /> The PROJECT is expected to qualify for Categorical Exclusion(CE)under WDSOT NEPA <br /> review and is assumed to qualify for SEPA MDNS under Everett and Mukilteo local <br /> jurisdictions. For this task, the CONSULTANT will draft and complete a Preliminary and Final <br /> NEPA CE Form with Endangered Species Act(ESA) Checklist,prepare a Cultural Resources <br /> and Historic Structures Assessment,an Environmental Justice Technical Memo, a Critical Areas <br /> Technical Memo, and a 4(f)Memo and De Minimis Form. A draft and final SEPA Checklist <br /> will also be prepared. The CONSULTANT will assist the CLIENT to coordinate with the City <br /> of Mukilteo and WSDOT staff for review and approval signatures on the CE Form and as may <br /> be needed for SEPA. <br /> Assumptions: <br /> • An early coordination conference call was held with WSDOT and CLIENT staff on <br /> October 21, 2019 to preliminarily scope the NEPA documentation levels described in this <br /> Scope of Work.No further coordination meetings are assumed with WSDOT. An email <br /> and/or call update with WSDOT can be facilitated by the CONSULTANT with the <br /> CLIENT for reconfirmation of NEPA documentation levels after the selection of a <br /> preferred closure alternative by others and before PSE and NEPA document preparation. <br /> • No city preapplication meetings will be scheduled or conducted by the CONSULTANT. <br /> SEPA process research and feedback with Everett and Mukilteo will be assumed to be <br /> handled by the CLIENT along with clarification of any local permit needs. <br /> • The CONSULTANT may provide information to the CLIENT for the CLIENT to <br /> complete any required local land use development permit applications required for the <br /> PROJECT and with available information to the CONSULTANT under other scope <br /> items. <br /> • CLIENT staff will be responsible for permit submittals and obtaining city permits and <br /> reviews related to any required development permit applications including administrative <br /> review, grading, site plan review,right-of-way use, and other related permits as required. <br /> • CONSULTANT preparation of a draft and final SEPA checklist is budgeted under this <br /> task to facilitate SEPA review and interlocal adoption. <br /> • Federal funding will require compliance with WSDOT NEPA. A NEPA CE is assumed <br /> to be the appropriate level of NEPA determination. A Preliminary and Final NEPA CE <br /> Documentation Form will be completed by the CONSULTANT for CIENT submittal to <br /> WSDOT. <br /> • The PROJECT will require Section 106 review under the National Historic Preservation <br /> Act according to Appendix J,Exhibit B of the October 2018 version of the WSDOT CE <br /> Guidebook(A-6).A Cultural Resource Survey inclusive of existing bridge <br /> documentation,documentation of two (2)potentially eligible historical buildings, and an <br /> Page 15 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.