Laserfiche WebLink
City of Everett Edgewater Creek Bridge Replacement <br /> • Structural constraints requirements <br /> • Maintenance <br /> Preliminary plan drawings of the recommended alternative will b e included in an <br /> appendix. The drawings will show the plan, elevation, and a typical section at a minimum. <br /> 12.2 PS&E Submittals <br /> Based on the City chosen alternative from the TS&L phase,the design team will prepare 30%, <br /> 60%, 90%, and 100%PS&E packages. Specification Manual will be provided at the 60%, 90%, <br /> and 100%PS&E packages. It is estimated that the final Plan set will include 146 sheets per table <br /> presented below. <br /> 12.2.1 30%P&E - This task encompasses all the activities associated with the preparation of <br /> the 30%Plans and Engineer's opinion of construction cost Estimate (P&E)documents. <br /> Constructability Review and QA/QC activities are an inherent part of this task. <br /> Deliverables: <br /> • Two 11x17 (half size)copies of Plans. <br /> • Two copies of the quantity Estimates and opinion of cost Estimate. <br /> 12.2.2 60%PS&E - This work element item encompasses all the activities associated with the <br /> preparation of the 60%Plans and engineer's opinion of construction cost Estimate (P&E) <br /> documents. Constructability Review and QA/QC activities are an inherent part of this <br /> element. <br /> Deliverables: <br /> • Two 11x17 (half size)copies of Plans. <br /> • Two copies of the quantity Estimates and opinion of construction cost. <br /> • Two copies of the preliminary Specifications <br /> 12.2.3 90%PS&E -This task encompasses all the activities associated with the preparation of <br /> the 90%Plans, Special Provisions and engineer's opinion of construction cost Estimate <br /> (PS&E). Constructability Review and QA/QC activities are an inherent part of this <br /> element. <br /> Deliverables: <br /> • Two 11x17(half size)copies of Plans <br /> • Two copies of the 90% Specifications Manual <br /> • Two copies of the quantity Estimates and opinion of construction cost. <br /> 12.2.4 98%Plans, Specifications & Estimate(PS&E) - This task encompasses all the <br /> activities associated with the preparation of the 90%Plans, Special Provisions and <br /> engineer's opinion of construction cost Estimate (PS&E). Constructability Review and <br /> QA/QC activities are an inherent part of this element. <br /> Deliverables: <br /> Page 38 of 42 <br />