Laserfiche WebLink
City of Everett Edgewater Creek Bridge Replacement <br /> WORK ELEMENT 14 CONSTRUCTION PHASE SUPPORT: <br /> In this work element and at the discretion of the City, construction phase services may be added <br /> to this contract. The following presents the envisioned tasks associated with this work element. <br /> 14.1 Engineering Support During Construction <br /> In this task TranTech's team will provide on-call engineering support services to the City during <br /> the construction period of the Project. This task encompasses review of and responses to <br /> Contractor RFIs; Submittals during the construction phase and preparation of As-built drawings <br /> and inventory load rating of the new bridge. <br /> Deliverables: <br /> • As-built drawings <br /> • Load Rating Analysis and Summary <br /> 14.2 Optional Construction Management Services <br /> TranTech's team possess a highly experienced and qualified CM team. In case the City desires, <br /> TranTech staff can augment City's team to provide CM services for this project. The following <br /> are the categorized activities associated with this Task: <br /> Pre-con Meeting;Providing Full-time Construction Project Manager for all aspects of <br /> construction activity including oversight of contractors and subcontractors, quality control, safety <br /> compliance,managing project changes, budget, and schedule. Provide continuous project <br /> management throughout the construction duration. This includes management of staff, <br /> subconsultants, and preparation for monthly invoices and progress reports;provide full-time <br /> senior inspectors(except when City Inspector is on team)to track quantities, daily inspection <br /> reports, etc.;Provide Full-time/part-time assistant inspector, as workload requires.; Review and <br /> respond to unanticipated conditions that occur during construction; Review requests to change or <br /> modify the work shown in the plans and specifications. Also provide recommendations to <br /> resolve the issue;prepare as-built drawings; and material testing <br /> Deliverables: <br /> • Progress Reports; Inspection Daily Reports; Submittal Reviews; RFI Reviews; Monthly <br /> Pay Estimates; Change Management; Record of Materials; Pre-con and Construction Photos; <br /> Testing and Lab Reports where necessary; Red-line As-built; Close-out <br /> Page 42 of 42 <br />