My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 1/31/2020
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 1/31/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 11:04:20 AM
Creation date
2/4/2020 11:55:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
1/31/2020
Council Approval Date
1/22/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Tracking Number
0002205
Total Compensation
$1,803,078.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech 1/8/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC 8/11/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GTC <br /> Exhibit E-Sub-consultant Cost Computations <br /> Edgewater Creek Bridge Replacement <br /> Work Element 8-Traffic Control-GTC <br /> Edward Brad Zech Maya <br /> Koltonowaki Lincoln,PE Wieben,PE McLain Total <br /> Project Principal/ <br /> Manager Project Engineer Engineer Clerical/ <br /> { <br /> Project Coordination 20 5 5 1 <br /> City of Everett(WSDOT/Mukilteo)preparation and Meeting(s)total 4 24 12 5 <br /> Neighborhood Meetings)Total of 2 10 3 5 <br /> 30%Traffic Control 2 25 <br /> 60%Traffic Control 1 15 <br /> 90%Traffic Control 3 15 2 <br /> Traffic Control Plan Drafting Coordination 4 10 2 <br /> Final Traffic Control Plan(100%) 10 20 10 5 <br /> Internal PA/CIC 6 4 <br /> Neighborhood Traffic Analysis 15 25 45 <br /> ContracfllnvoicinglEtc. 2 5 <br /> Total Staff Hours 97 130 73 15 315 <br /> Direct Rates $101.41 $76.06 $36.50 $30.00 <br /> Total Direct Salary Cost $9,837 $9,888 $2,885 $450 $22,839 <br /> Total Labor Cost $22,839 <br /> OH at 110.00%of Direct Labor $25,123 <br /> Profit at 28.4%of Direct Labor $6,486 <br /> Total $64,448 <br /> Direct Costs(Mileage,Reproduction,count Data Collection,CAD etc.) $6,000 <br /> Specialized Data Collection for Neighborhood Analysis O-D Counts $15,000 <br /> Total: $74,448 <br /> Notes: <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.