Laserfiche WebLink
• Mr. Drew Martin <br /> Plan Check Number: B1901-029, First Building Review Letter Response <br /> April 30, 2019 <br /> 9. Elevation 2A-1.1 provides elevations for the bathroom. See IBC Section 1101.2. The <br /> following comments shall be addressed; <br /> Response: <br /> Elevation 2/A-1.1 of the proposed restroom has been corrected per IBC Section 1101.2 <br /> a. Elevation "D"shall include a vertical grab bar per ICC A117.1-09 Section 604,5.1 and <br /> Figure 604,51, <br /> Response: <br /> Vertical grab bar and dimensions have been added to Elevation "D"per ICC A117.1-09 Section <br /> 604.5.1 and Figure 604.5.1. <br /> b. Additional dimensions for the position of the rear wall grab bar shall be provided per ICC <br /> A117.1-09 Section 604.52 and Figure 604.52. <br /> Response: <br /> Additional dimensions for the position of the rear wall grab bar have been added to Elevation <br /> "A" per ICC A117.1-09 Section 604.5.2 and Figure 604.5.2. <br /> c. The sinks shall be provided with pipe protection per ICC A117.1-09 Section 606.6. <br /> Response: <br /> Elevation "A" note has been revised for clarity; pipe protection shall be provided per ICC <br /> A117.1-09 Section 606.6. <br /> Miscellaneous; <br /> 10. Sheet A-1.1 specifies installation of new Door D102, The following comments shall be <br /> addressed: <br /> Response: <br /> Door Schedule for door type D102 has been revised on sheet A-1.1 <br /> a. The Type B door appears to include glazing. The glazing shall be safety glass per IBC <br /> Section 2406,4.1. <br /> Response: <br /> Note regarding safety glass per IBC Section 2406.4.1 has been added to Door Schedule for <br /> Door D102, Type B. <br /> O523 61ST ST SE 0 425.879.3437 O brianbodge@msn.com <br /> Everett, WA 98203 \"J <br /> 6/10 <br />