My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4920 EVERGREEN WAY STAPLES Geotech Report 2022-10-25
>
Address Records
>
EVERGREEN WAY
>
4920
>
STAPLES
>
Geotech Report
>
4920 EVERGREEN WAY STAPLES Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:10:28 PM
Creation date
2/7/2020 8:57:16 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
4920
Tenant Name
STAPLES
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Report lierracon <br /> Staples Rockery Failure■ Everett,Washington <br /> March 8, 2019 • Terracon Project No. 81175122 <br /> 4.5.4 Drainage and Permanent Facing <br /> To relieve hydrostatic pressure behind the wall, geocomposite drainage should be installed <br /> between the permanent facing and the temporary timber lagging. The geocomposite drain should <br /> span between soldier pile flanges. At the base of the wall, PVC plastic or metal pipes known as <br /> weepholes should project through the permanent facing to transmit water collected by the <br /> geocomposite drain to a drainline or gutter installed in front of the wall. The drain line or gutter <br /> should be sloped to provide positive gravity drainage or to a sump pit and pump. If installed below <br /> grade, the drain line should be surrounded by clean, free-draining granular material having less <br /> than 5 percent passing the No. 200 sieve. The free-draining aggregate should be encapsulated <br /> in a filter fabric. <br /> If controlling hydrostatic pressure behind the wall as described above is not possible, then <br /> combined hydrostatic and lateral earth pressures should be calculated for granular backfill, an <br /> equivalent fluid weighing of 82 pcf should be used for active earth pressure and (82)H psf for the <br /> maximum ordinate of the apparent earth pressure. These pressures do not include the influence <br /> of surcharge, equipment or pavement loading, which should be added. Heavy equipment should <br /> not operate within a distance closer than the exposed height of retaining walls to prevent lateral <br /> pressures more than those provided. <br /> A permanent facing constructed via shotcreting after installation of the drainage system is typical. <br /> The permanent facing should be designed to resist long-term static and seismic earth pressures. <br /> 4.5.5 Retaining Wall Construction <br /> The contractor should be required to prevent caving and loss of ground in all soldier pile drill <br /> holes. The retaining wall contractor will need to use methods to minimize caving and sloughing of <br /> the drill holes, such as the use of augercast methods or installation of casing. If more than one <br /> foot of water is present in the bottom of the hole, placement of concrete from the bottom of the <br /> hole will be required. <br /> When drillingboreholes for tieback installation, casingmaybe required toprevent cavingand loss <br /> q <br /> of ground. Grout should be pumped into the bond zone by tremie methods in order to remove <br /> water from the hole and continuously grout the anchor. <br /> Voids behind the lagging should be backfilled immediately with a permeable granular soil material <br /> or lean concrete. <br /> 4.5.6 Monitoring <br /> Monitoring of the retaining system during construction should include measurements of horizontal <br /> movements at the top of every soldier pile. The measuring system used for shoring monitoring <br /> should have an accuracy of at least 0.01-feet. All reference points on existing structures should <br /> be installed and readings taken prior to commencing construction. All reference points should be <br /> read prior to and during critical stages of construction. The frequency of readings will depend on <br /> Responsive• Resourceful • Reliable 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.