Geotechnical Engineering Report lierracon <br /> Staples Rockery Failure■ Everett,Washington <br /> March 8, 2019 • Terracon Project No. 81175122 <br /> 4.5.4 Drainage and Permanent Facing <br /> To relieve hydrostatic pressure behind the wall, geocomposite drainage should be installed <br /> between the permanent facing and the temporary timber lagging. The geocomposite drain should <br /> span between soldier pile flanges. At the base of the wall, PVC plastic or metal pipes known as <br /> weepholes should project through the permanent facing to transmit water collected by the <br /> geocomposite drain to a drainline or gutter installed in front of the wall. The drain line or gutter <br /> should be sloped to provide positive gravity drainage or to a sump pit and pump. If installed below <br /> grade, the drain line should be surrounded by clean, free-draining granular material having less <br /> than 5 percent passing the No. 200 sieve. The free-draining aggregate should be encapsulated <br /> in a filter fabric. <br /> If controlling hydrostatic pressure behind the wall as described above is not possible, then <br /> combined hydrostatic and lateral earth pressures should be calculated for granular backfill, an <br /> equivalent fluid weighing of 82 pcf should be used for active earth pressure and (82)H psf for the <br /> maximum ordinate of the apparent earth pressure. These pressures do not include the influence <br /> of surcharge, equipment or pavement loading, which should be added. Heavy equipment should <br /> not operate within a distance closer than the exposed height of retaining walls to prevent lateral <br /> pressures more than those provided. <br /> A permanent facing constructed via shotcreting after installation of the drainage system is typical. <br /> The permanent facing should be designed to resist long-term static and seismic earth pressures. <br /> 4.5.5 Retaining Wall Construction <br /> The contractor should be required to prevent caving and loss of ground in all soldier pile drill <br /> holes. The retaining wall contractor will need to use methods to minimize caving and sloughing of <br /> the drill holes, such as the use of augercast methods or installation of casing. If more than one <br /> foot of water is present in the bottom of the hole, placement of concrete from the bottom of the <br /> hole will be required. <br /> When drillingboreholes for tieback installation, casingmaybe required toprevent cavingand loss <br /> q <br /> of ground. Grout should be pumped into the bond zone by tremie methods in order to remove <br /> water from the hole and continuously grout the anchor. <br /> Voids behind the lagging should be backfilled immediately with a permeable granular soil material <br /> or lean concrete. <br /> 4.5.6 Monitoring <br /> Monitoring of the retaining system during construction should include measurements of horizontal <br /> movements at the top of every soldier pile. The measuring system used for shoring monitoring <br /> should have an accuracy of at least 0.01-feet. All reference points on existing structures should <br /> be installed and readings taken prior to commencing construction. All reference points should be <br /> read prior to and during critical stages of construction. The frequency of readings will depend on <br /> Responsive• Resourceful • Reliable 13 <br />