Laserfiche WebLink
7 <br /> SEPA ENVIRONMENTAL CHECKLIST FOR <br /> Beverly Park Switching Station Expansion AGENCY <br /> P.U.D. NO. 1 of Snohomish County USE <br /> • "Geotechnical Engineering Services, Beverly Park Switching Station <br /> Expansion", prepared by GeoEngineers, Inc, DRAFT May 7, 2009. <br /> • "Sound analysis for Beverly Park Switching Station", prepared by BRC • <br /> Acoustics &Technology Consulting, October 12, 2007. <br /> • "Stormwater Site Plan, Beverly Park Switching Station Expansion," <br /> prepared by RW Beck, June 2009. <br /> 9. Describe applications pending for governmental approvals of other proposals directly <br /> affecting the property covered by this proposal. <br /> • None <br /> 10. Governmental approvals or permits that will be needed for this proposal. <br /> Snohomish County PUD: <br /> • SEPA Checklist and determination <br /> • Endangered Species Act listed salmonids Checklist <br /> City of Everett: <br /> • Grading Permit <br /> • TESC Plan Approval <br /> • Right-of-Way Use Permit <br /> • Fence Permit <br /> • Public Works Permit for Re-routing Storm and Sanitary lines <br /> • Public Works Permit for Upgrading Existing Driveways and Paving <br /> within City's right-of-way <br /> • Building Permit for Retaining Walls <br /> • Landscape Plan Approval <br /> Department of Ecology: <br /> • NDPES Construction Stormwater General Permit (Notice of Intent) <br /> ?age <br />