Laserfiche WebLink
SEPA ENVIRONMENTAL CHECKLIST FOR <br /> Beverly Park Switching Station Expansion AGENCY <br /> P.U.D. NO. 1 of Snohomish County USE <br /> i. Approximately how many people would reside or work in the completed project? <br /> • No personnel will reside at the completed facility. The switching station is <br /> an unattended facility. Operations and maintenance personnel will visit the <br /> facility approximately once each month. <br /> j. Approximately how many people would the completed project displace? <br /> • None <br /> k. Proposed measures to avoid or reduce displacement impacts, if any: <br /> • NIA <br /> I. Proposed measures to ensure the proposal are compatible with existing and <br /> projected land uses and plans, if any: <br /> • The proposed use of the property will continue its present use as an <br /> electrical switching station. <br /> 9. Housing <br /> a. Approximately how many units would be provided, if any? Indicate whether high, <br /> middle, or low-income housing. <br /> • N/A <br /> b. Approximately how many units, if any would be eliminated? Indicate whether high, <br /> middle, or low-income housing. <br /> • N/A <br /> c. Proposed measures to reduce or control housing impacts, if any: <br /> • None <br /> 10. Aesthetics <br /> a. What is the tallest height of any proposed structure(s), not including antennas; what <br /> is the principal exterior building material(s) proposed? <br /> • The termination structures in the 115 kV yard will be the same as existing <br /> structures, approximately 45 feet in height and the termination structures <br /> in the lower yard will be approximately 75 feet in height. <br /> 333 <br />