Laserfiche WebLink
S <br /> Mr. James Grafton <br /> Providence Health and Services -Washington <br /> Plan Check Number: B1905-020, First Building Review <br /> June 25, 2019 <br /> Accessibility: <br /> 6. The project involves Level 2 Alterations to the building per IEBC Chapter 8. Accessibility <br /> improvements per IEBC Section 705.2 shall be included in the project. Where the primary <br /> space is made to be less than fully-accessible per one of the exceptions, documentation <br /> substantiating the limited accessibility improvements shall be submitted for review. Where <br /> Exception 1 is used, the documentation shall itemize the improvements and estimated cost of <br /> work associated with each item. See IEBC Section 806.1. <br /> 7. Room C2-045 on Sheet A6.01 is a new accessible bathroom. Elevations for Room C2-045 are <br /> provided on Sheet A7.02. Standard plumbing details are provided on Sheet A7.01. See IBC <br /> Section 1102.1, and references below to ICC A117.1-09 unless noted otherwise. The following <br /> comments shall be addressed: <br /> a. The rear grab bar does not appear to comply with Figure 604.5.2. <br /> b. Locate the water closet flush control on the open side per Section 604.6. <br /> c. Specify signage outside the door on Sheet A6.01 per IBC Section 1111.1. <br /> Miscellaneous: <br /> 8. The proposed work areas includes a new single-user unisex bathroom at Grid D/3 per Sheet <br /> A6.01. The occupant load for the new pharmacy area is 46 per Sheet A0.21. It appears that <br /> the new restroom is required because other facilities on this floor are located within suites or <br /> private rooms, and are therefore not accessible. A minimum of one male and one female <br /> restroom is required per IBC Table 2902.1 Item 5 for an I-2 occupancy. An additional restroom <br /> shall be provided, or documentation shall be submitted demonstrating that the existing facilities <br /> are sufficient to support this area in addition to the existing building load. The restrooms routes <br /> shall be accessible per Section 2902.3.1 and shall comply with Section 2902.3.2. See IBC <br /> Sections 2902.1.1 and 2902.2. <br /> 9. The proposed work areas includes a new single-user unisex Bathroom C2-045 at Grid D/3 per <br /> Sheet A6.01. Door 045 shall be provided with an interior lock. The lock shall be specified in <br /> the Door Schedule on Sheet A8.11. See IBC Section 1210.3.1 Exception 1. <br /> Structural <br /> 1. Sheet A1.01 indicates that the structural floor slab will be infilled at Grids B/3.4, C.5/5.5, and <br /> E/5.6. See IBC Sections 107.2.1, 1603.1, 1604.1, and 1604.4. The following comments shall <br /> be addressed: <br /> a. Structural details for the floor infills shall be provided in the construction drawings. <br /> b. Sheet A1.01 addresses floor infills for the Level 2 floor only. It is not clear if infills will also <br /> be required for the structure above. Additional plans and details shall be provided <br /> specifying the required construction above if infills are required. <br /> c. Structural calculations for the design of the infills shall be submitted for review. The infill <br /> shall be designed for the design live and dead loads, including concentrated loading, that <br /> they must support. <br /> CD <br /> 3200 Cedar Street 0425.257.8810 0 everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/pe u' <br /> 'age 3of4 <br />