Laserfiche WebLink
City of Everett 12020 Water,Filtration,Sewer,and Stormwater Rate Study EN <br /> Project Team <br /> Project Team <br /> Introduction <br /> This section of the proposal will discuss our project team organization and the key project team <br /> members. <br /> Key Project Team Members <br /> Provided below is a brief discussion of HDR's key project team member expertise, their roles in <br /> the project, and their experience related specifically to this project. <br /> Shawn Koorn— Project Manager <br /> • More than 20 years of experience in utility rate setting, including revenue <br /> requirements, cost of service, and rate design. <br /> • Project manager for numerous water cost of service and rate studies.r • Recognized expert in the area of water cost of service and rate design. <br /> , 1 • Co-instructor for the American Water Works Association (AWWA) <br /> ,� • �� ;, ' ' Financial Management seminar. <br /> -,�. , as ;;. • Contributing author to the AWWA M-54 manual, Developing Rates for <br /> Small Systems. <br /> • Provides effective presentations to City Councils, the public, and industry <br /> conferences(e.g., AWWA, WEF). <br /> Kevin Lorentzen— Senior Financial Analyst <br /> • More than 12 years of industry experience in utility financial planning, cost <br /> of service and rate design. <br /> • Expert level expertise in Excel computer/rate modeling and financial <br /> " ' , planning models <br /> • m • Previously worked in the Finance Department of the City of Bellevue as <br /> the lead forecaster. <br /> • Developed the rate models for the City during the 2016 rate study. <br /> a Provided as needed assistance in updating the rate models for the City <br /> since the completion of the rate study <br /> Josiah Close— Financial Analyst <br /> S • Six(6)years of experience in developing cost of service and rate design <br /> models for water, recycled sewer and stormwater systems. <br /> • Highly experienced in reviewing and assimilating customer consumption <br /> data <br /> k • Conducted rate/fee analysis and modeling for the City of Oak Harbor, WA <br /> t =; (water, sewer, stormwater& solid waste), City of Issaquah, WA(water, <br /> sewer, storm), and City of Stockton(water and sewer). <br /> Page 14 <br />