My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Inc. 4/2/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
HDR Inc. 4/2/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2020 1:10:04 PM
Creation date
4/20/2020 1:09:01 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Inc.
Approval Date
4/2/2020
Council Approval Date
3/18/2020
End Date
9/30/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port Gardner Storage Facility-Facilities Plan
Public Works WO Number
UT3728
Tracking Number
0002288
Total Compensation
$997,885.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FN <br /> Client Responsibilities <br /> 1. Coordinate system reviews with representatives from the WPCF, TSG and S&D. <br /> 2. Provide meeting rooms for the high level options review and the alternatives review <br /> workshop. <br /> 3. Provide review comments and preferences on the alternatives. <br /> Assumptions <br /> 1. Conveyance options are discrete methods and construction sequence of conveying <br /> flows from specific points in the PGSF basin to the storage facility. <br /> 2. Conveyance alternatives are a combination of options to meet the objectives of <br /> conveying all flows necessary to: <br /> a) Bring the remaining CSO sites into control. <br /> b) Provide additional benefits of reducing stormwater and combined sewage discharges <br /> to near shore outfalls. <br /> c) Provide additional benefits of reducing out of basin capital improvements such as <br /> bringing SRO7 and SRO8 into compliance or reducing, eliminating or delaying the <br /> 17th Street Interceptor augmentation. <br /> 3. Preference will be made to identify primarily gravity flow options. <br /> 4. Reducing the flow rate to the conveyance system to WPCF will be a key criteria in <br /> developing alternatives. <br /> 5. The Base Conveyance System Alternative provided by the City will be one of the <br /> conveyance alternatives. <br /> 6. Class 5 Capital Cost Opinions for conceptual alternatives are used for early planning <br /> purposes and will have a range of accuracy based upon AACE International <br /> Recommended Practice No. 18R-97, Class 5, 0- to 2- percent project definition, +100% <br /> to -50% Range of Accuracy. <br /> Deliverables <br /> 1. Meeting summary of high level options review including GIS based mapping illustrating <br /> the location of conveyance options (PDF format). <br /> 2. Meeting summary of alternative review workshop including alternatives matrix (PDF <br /> format). The matrix shall include a summary of modeling scenarios to be performed. <br /> 3. GIS based figures illustrating the Conveyance alternatives (PDF format). <br /> 4. Class 5 OPCC of the alternatives (PDF format). <br /> 5. Summarized modeling results to support each alternative and demonstrate ability of the <br /> alternative to satisfy(or not satisfy) goals. <br /> Subtask 303 - Conveyance System Alternative Selection <br /> Consultant Services <br /> 1. Meet with the City and present the alternatives in a workshop with the City. <br /> City of Everett—Port Gardner Storage Facility 10 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.