My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Inc. 4/2/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
HDR Inc. 4/2/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2020 1:10:04 PM
Creation date
4/20/2020 1:09:01 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Inc.
Approval Date
4/2/2020
Council Approval Date
3/18/2020
End Date
9/30/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port Gardner Storage Facility-Facilities Plan
Public Works WO Number
UT3728
Tracking Number
0002288
Total Compensation
$997,885.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Based on the alternative review workshop identify the top two (2) conveyance <br /> alternatives. <br /> 3. Implement the selection process developed in the previous task and make a final <br /> selection of the conveyance routing alternatives. <br /> Client Responsibilities <br /> 1. Participate in the alternative selection workshop. <br /> Assumptions <br /> 1. Alternative review workshop will be four(4) hours and attended by three HDR staff. <br /> 2. Selection of the preferred alternative will be made by the City at or within one (1) week of <br /> the alternative selection workshop. <br /> Deliverables <br /> 1. Meeting notes of alternative selection workshop (PDF format). <br /> Subtask 304 — Preferred Conveyance Alternative Development <br /> Consultant Services <br /> 1. Develop the selected alternative by identifying discrete construction projects, final design <br /> requirements, constraints, and implementation schedule. <br /> 2. Consider out of basin improvements at the WPCF or elsewhere in the wastewater <br /> system that are reduced, delayed or eliminated in developing the final selected <br /> alternative. <br /> 3. Provide detail to develop Class 4 OPCC of the preferred alternative. <br /> 4. Develop a 10-percent design of the selected conveyance improvements based on GIS <br /> information. <br /> 5. Identify additional investigations and work needed to support final design of the <br /> conveyance improvements. <br /> 6. Prepare a summary TM summarizing the proposed conveyance improvements. <br /> Client Responsibilities <br /> 1. Provide system constraints at the WPCF and elsewhere in the collection system that will <br /> affect the selected alternative. <br /> 2. Provide review comments of Draft Summary TM. <br /> Assumptions <br /> 1. Final TM will be provided three weeks after receipt of City comments. <br /> 2. Class 4 Capital Cost Opinions for conceptual alternatives will have a range of accuracy <br /> based upon AACE International Recommended Practice No. 18R-97, Class 4, of 1-to <br /> 15 percent project definition, +50%to -30% Range of Accuracy. <br /> City of Everett—Port Gardner Storage Facility 11 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.